My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 American Asphalt Repair and Resurfacing Co., INC (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 American Asphalt Repair and Resurfacing Co., INC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2008 1:50:22 PM
Creation date
12/18/2008 1:50:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
American Asphalt Repair and Resurfacing
PROJECT NAME
Resurfacing and Restriping Project
RMP File Number
304
Date
12/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the <br />State of California (hereinafter referred to as "City") and AMERICAN ASPHALT <br />REPAIR AND RESURFACING CO., INC. located at 24200 ClAWITER ROAD, <br />HAYWARD, CA 94545 (hereinafter referred to as "Contractor") (collectively, the <br />"Parties"), for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide <br />and furnish all of the labor, equipment, materials, and tools to perform, <br />within TWENTY (20) calendar days after the NOTICE TO PROCEED, the <br />following work: <br /> <br />MIDDlEFIElD ROAD <br />RESURFACING AND RESTRIPING PROJECT <br />(MAPLE STREET TO WOODSIDE ROAD) <br /> <br />. <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto as described in Exhibit "A", attached hereto and <br />incorporated herein, signed by the Manager, Engineering and Construction <br />of Redwood City, which Documents are incorporated herein and made a part <br />of this Agreement as if herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance <br />by Contractor of the aforementioned work, the amount of Sixty Three <br />Thousand and Seven Hundred and Eighty-eight and No/100 Dollars <br />($63,788.00) computed in accordance with Contractor's accepted Proposal <br />dated, October 31, 2008 which accepted Proposal is incorporated herein by <br />reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision <br />of, and to the approval of, City or its authorized representative, and the work <br />shall be done in the best workmanlike manner, conforming strictly to the <br />provisions of the specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to <br />1815, inclusive, of the California labor Code relating to working hours. <br />Contractor shall, as a penalty to City, forfeit Twenty five and No/100 Dollars <br />($25.00) for each worker employed in the execution of the Contract by <br />Contractor or by any subcontractor for each calendar day during which such <br />worker is required or permitted to work more than eight (8) hours in any <br />one (1) calendar day and 40 hours in anyone (1) calendar week, unless such <br />worker receives compensation for all hours worked in excess of eight (8) <br />hours at not less than 1-1/2 times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California labor Code Section 1773.2, Contractor is hereby advised that <br />copies of the prevailing rate of per diem wages and a general prevailing rate <br />for holidays, Saturdays and Sundays and overtime work in the locality in <br />which the work is to be performed for each craft, classification, or type of <br />
The URL can be used to link to this page
Your browser does not support the video tag.