My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Southland Construction Management, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Under 100k PWS
>
Agmt11 Southland Construction Management, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2011 1:02:00 PM
Creation date
12/14/2011 12:59:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Southland Construction Management, Inc.
PROJECT NAME
Redwood City Fire Station #9 Kitchen Remodel
RMP File Number
304
Date
11/30/2011
Sticky Note
ID:
1
Text:
Payment Bond pages 5-9.
Perfoemance Bond pages 10-13.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , <br /> . � <br /> . , <br /> ORIGINAL ! <br /> AGREEMENT <br /> with the <br /> City of Redwood City <br /> REDWOOD CITY FIRE STATION #9 KITCHEN REMODEL <br /> THIS AGREEMENT, made this 3� day of �, 201L, by and between Southland <br /> Construction Management Inc. whose place of business is at 3942 Valley Avenue, Ste. A, <br /> Pleasanton, CA 94566, hereinafter called "CONTRACTOR", and the City of Redwood City, a <br /> Charter City and municipal corporation of the State of California, hereinafter referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set foRh, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of Eighty six thousand <br /> seven hundred fifty seven and 88/100 Dollars ($86,757.88), computed in �1 <br /> accordance with Contractor's Accepted dated October�6 2011, which���/�� <br /> �� s incorporated herein by reference ereto as if fully set forth. <br /> ��� � ��,/�� <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local 12 <br /> taxes on materials and equipment, and labor fumished by Contractor, its <br /> � subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set foRh in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Final Completion of the Work within 120 Calendar <br /> Days from the date the Contract Time commences to run. <br /> ATTY/AGRI2011.132/RWC FIRE STATION #9 KITCHEN REMODEL � <br /> REV:11/29/11 <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.