My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Casey Construction, Inc (2).
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Casey Construction, Inc (2).
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 4:45:31 PM
Creation date
8/16/2016 4:43:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Casey Construction, Inc.
PROJECT NAME
Watermain Replacement Project
Date
8/16/2016
MO Ref
16-135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT <br /> For the ORIGINAL <br /> City of Redwood City <br /> 2015-2016 WATERMAIN REPLACEMENT PROJECT <br /> THIS AGREEMENT, made this I L day of /IUST , 2016, by and between Casey <br /> Construction, Inc. , whose place of business is at 619 Sylvan Way, Emerald Hills. CA 94062 <br /> hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and municipal <br /> corporation of the State of California, hereinafter referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree as <br /> follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions of <br /> the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of <br /> Six Hundred Thirty-Two Thousand , Four Hundred Ninety Eight 00/100 Dollars <br /> ($632,498.00) computed in accordance with Contractor's Accepted Proposal Bid <br /> dated , Jun 1 , 2016, which Proposal Bid is incorporated herein by reference thereto <br /> as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other taxes <br /> on any item or service that is part of the Work, whether such taxes are normally <br /> included in the price of such item or service or are normally stated separately. <br /> Notwithstanding the foregoing , each party shall bear such state or local inventory, real <br /> property, personal property or fixtures taxes as may be properly assessed against it <br /> by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions) ; and <br /> 1 . Contractor shall achieve Substantial Completion of the Work within One <br /> Hundred Twenty (120) Calendar Days from the date the Contract Time <br /> commences to run. <br /> B. Liquidated Damages <br /> 1 . City and Contractor recognize that time is of the essence of this Agreement <br /> and that City will suffer financial loss in the form of lost revenues, contract <br /> Agreement <br /> 2015-2016 WATERMAIN REPLACEMENT PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.