My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Accutite - Technology En
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Accutite - Technology En
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 2:09:15 PM
Creation date
8/30/2004 9:12:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Accutite - Technology Engineering & Construction
PROJECT NAME
fuel tank removal & monitoring
RMP File Number
304
Date
12/5/2003
MO Ref
03-278 04-143
Box
6360
Sticky Note
ID:
1
Text:
p 1-4 Agreement
p 5-7 Notice of Completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 1 <br /> AGREEMENT ORIGINAL <br /> FOR THE <br /> CITY OF REDWOOD CITY <br /> FUEL TANK REMOVAL AND FUEL MC~ITORING IMPROVEMENT~OJECT <br /> THIS AGREEMENT, made this ~day of D~ , 2003, by and <br />between TECHNOLOGY ENGINEERING AND CONSTRUCTION, INC. (dba Accutite), whose <br />place of business is located in South San Francisco, California ("Contractor"), and the CITY OF <br />REDWOOD CITY, a charter city and municipal corporation of the State of California ("City"). <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br />I. WORK <br /> A. Contractor shall complete all Work specified in the Contract Documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract Documents. <br />II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract Documents, as the amount of One Hundred Four <br /> Thousand Eighty Five and No/100 Dollars, ($104,085.00) computed in accordance <br /> with Contractor's Accepted Proposal dated, October 29, 2003, which Proposal is <br /> incorporated herein by reference thereto as if fully set forth. This Contract Sum is <br /> the result of subtracting the Deductive Alternate (Item No.9) from the Base Bid <br /> ($1001585 - $6,500 = $104,085). <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br />Atty/Agr/Agr.163 <br />111003 1 <br />.-. - T' . .-. <br /> .., <br />
The URL can be used to link to this page
Your browser does not support the video tag.