My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt98 Casey Construction (2)
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1998
>
Agmt98 Casey Construction (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 3:04:21 PM
Creation date
5/20/2005 2:41:23 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Casey Construction
PROJECT NAME
Redwood Creek concrete wall
RMP File Number
304
Date
11/9/1998
Reso Ref
13460 13496
MO Ref
99-053
Box
5933
Sticky Note
ID:
1
Text:
1 agreement
9 notice of completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />DES:djk 1011 4/9& <br />F:Sharcd/Rcdwood/Council/ Agmt-206 <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and CASEY CONSTRUCTION of Redwood City, <br />California, hereinafter referred to as "Contractor", for the consideration hereinafter <br />stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of labor, equipment, materials and tools to perform within Ninety (90) <br />calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />REDWOOD CREEK CONCRETE WALL REPLACEMENT PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the City Engineer of Redwood City, which <br />Documents are incorporated herein and made a part of this Agreement as if <br />herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Two Hundred Thirty-eight <br />Thousand Nine Hundred Eighty-four and No/100 Dollars ($238,984.00) computed <br />in accordance with Contractor's accepted Proposal dated October 7, 1998, which <br />accepted Proposal is incorporated herein by reference thereto as if herein fully set <br />forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, <br />and to the approval of, City or its authorized representative, and the work shall be <br />done in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor <br />shall, as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for <br />each worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than 8 hours in anyone calendar day and 40 hours <br />in anyone calendar week, unless such worker receives compensation for all <br />hours Worked in excess of eight (8) hours at not less than 1-1/2 times the basic <br />rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California Labor Code Section 1773.2, Contractor is hereby advised that <br />copies of the prevailing rate of per diem wages and a general prevailing rate <br />
The URL can be used to link to this page
Your browser does not support the video tag.