My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Andes Construction Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Andes Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2013 5:01:06 PM
Creation date
3/5/2013 4:59:47 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Andes Construction Inc.
PROJECT NAME
2011-2012 Sewer Rehabilitation Project
RMP File Number
304
Date
3/5/2013
MO Ref
13-021
Sticky Note
ID:
1
Text:
Performance Bond pages 5-7.
Payment Bond Pages 8-11.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. . ����1�1���� <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> 2011 - 2012 SEWER REHABILITATION PROJECT <br /> THIS AGREEMENT, made this�day of � � , 2013, by and <br /> between Andes Construction Inc. whose place of business is at 05 E. 12th Street, Oakland, CA <br /> 94601 hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and <br /> municipal corporation of the State of California, hereinafter referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of One Million Two <br /> Hundred Twelve Thousand One Hundred Twenty and 00/100 Dollars <br /> ($1,212,120.00), computed in accordance with Contractor's Accepted �e�ssa�Bid <br /> dated December 12, 2012, which �apes� Bid is incorporated herein by reference <br /> thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, sub consultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's perFormance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within one <br /> 00520-1 <br /> 2011-2012 SEWER REHABILITATION PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.