Laserfiche WebLink
8.B. - Page 8 <br /> Staff Recommendation to the Planning Commission <br /> Staff initially recommended certification of the Final EIR and approval of the Use Permit <br /> for up to 180 students and 20 employees to the Planning Commission. Staff evaluated <br /> the Project's feasibility and code compliance against specific metrics and relevant <br /> planning policies (see also Attachment 12), including: <br /> • General Plan land use designation <br /> • General Plan policies <br /> • Zoning district requirements <br /> • Use Permit findings <br /> • Environmental review (CEQA) <br /> • Community input <br /> General Plan policies and Zoning district requirements encourage schools in residential <br /> neighborhoods, and though the Final EIR found that there would be a significant <br /> unavoidable noise impact resulting from the sound of children playing outdoors, staff <br /> found that the benefits of the Project are consistent with General Plan policies and <br /> Zoning district requirements that encourage schools in residential neighborhoods. The <br /> Final EIR did not identify significant unavoidable traffic impacts, though staff recognizes <br /> that additional traffic would result from approval of this application, and acknowledges <br /> the neighborhood concerns regarding traffic and safety and the concentration of school <br /> in one particular area of the City. <br /> Absent specific criteria or requirements that explicitly identify a cap on student <br /> enrollments (or the number of schools) permitted within a defined geographic area, the <br /> City must analyze these proposals on a case by case and neighborhood by <br /> neighborhood basis. This is the exact reason why schools are only conditionally <br /> allowed in residential areas. The Municipal Code realizes that schools operate in an <br /> inherently different manner than residential uses, and therefore must be analyzed and <br /> scrutinized more carefully to determine if a particular project will be compatible with the <br /> surrounding area. <br /> A more thorough analysis of staff's recommendation can be found in the attached <br /> Planning Commission staff report. Additionally, if the Council opts to overturn the <br /> Planning Commission decision, and approve the school use, the attached alternative <br /> resolution spells out the exact finding that need to be made. <br /> Environmental Review /Concerns by Neighbors <br /> A Draft EIR (Attachment 4) and the Final EIR (Attachment 5) have been prepared for <br /> the Project. The Draft EIR identified significant unavoidable noise impacts related to the <br /> Project's outdoor activities, specifically related to noise generated from children playing <br /> outdoors and its impact on adjacent residential properties. The Draft EIR did not <br /> identify significant traffic impacts related to the Project, though staff acknowledges that <br /> neighborhood traffic concerns resulting from the expansion of Roosevelt School <br /> continue to be an issue. During the application review process for the Project, Roosevelt <br /> School expanded its grade levels from kindergarten through 5 grade to transitional <br />