My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-07-28 Closed, Special and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-07-28 Closed, Special and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2014 9:34:48 AM
Creation date
7/24/2014 3:03:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
7/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 63 <br /> d. Mitigation measures or alternatives which are considerably different from those analyzed <br /> in the previous EIR would substantially reduce one or more significant effects on the <br /> environment, but he project proponents decline to adopt the mitigation measure or <br /> alternative. <br /> CEQA Guideline §15164 states that the lead agency or a responsible agency shall prepare an <br /> addendum to a previously certified EIR if some changes or additions are necessary, but none of the <br /> conditions described in §15162 (see above) calling for preparation of a subsequent EIR have <br /> occurred. <br /> Based on information contained in the certified EIR and knowledge of the project area, the City has <br /> concluded that the proposed changes to the project description (i.e., a later start time and a 17 percent <br /> reduction in enrollment), would not result in new significant environmental effects or increase the <br /> severity of previously identified significant effects. On the contrary, the proposed changes would <br /> reduce the length of the school day and associated noise level increase, reduce the volume of project - <br /> generated traffic, and avoid exacerbating morning Roosevelt School traffic congestion in the project <br /> area. The conclusions in the EIR would not change. For these reasons, a supplemental or subsequent <br /> EIR is not required and this addendum to the Cambridge Academy Project has been prepared. <br /> This addendum will not be circulated for public review, but will be attached to the Cambridge <br /> Academy Project EIR, pursuant to CEQA Guidelines § 15164(c). <br /> City of Redwood City 2 EIR Addendum <br /> Cambridge Academy Project April 4, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.