My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-07-28 Closed, Special and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-07-28 Closed, Special and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2014 9:34:48 AM
Creation date
7/24/2014 3:03:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
7/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 70 ATTACHMENT 13 <br /> plans and consistent with available infrastructure and community <br /> services. Two scenarios were evaluated under the No Project <br /> Alternative: The No Development Scenario and the Development <br /> Under Existing Zoning Scenario. Under the No Development <br /> Scenario, no new development would occur on the project site, <br /> the church and Montessori Preschool would continue to operate <br /> on the site, and there would be no new environmental impacts. <br /> Under the Development Under Existing Zoning Scenario, <br /> because existing development on the project site includes a <br /> vacant classroom building and schools are permitted on the <br /> property with approval of a Use Permit, it is reasonably <br /> foreseeable that a school could be operated on the site in the <br /> future, as evidenced by the expiration of the previously approved <br /> school, Woodside Hills Christian Academy (Project No. UP2007- <br /> 29), the Montessori Preschool currently operating onsite with an <br /> approved Use Permit (Project No. UP2011 -28), and the historical <br /> use of the property as a school site. In addition, the operation of <br /> a school in the future on the project site could result in a <br /> significant unavoidable noise impact similar to the Project's noise <br /> impacts as described in the EIR. The City rejects this alternative <br /> as infeasible because it is not likely to avoid or substantially <br /> lessen the Project's sole significant and unavoidable impact <br /> (noise), and it would not achieve the City's and the Project <br /> Applicants' objectives for the Project. <br /> b. Consolidated Outdoor Activities Alternative: The scenario <br /> evaluated under the Consolidated Outdoor Activities Alternative <br /> (Summary section on p. 3 -4 and Section 7.3 on p. 93 -96 of the <br /> Draft EIR) reduces the total amount of time during the school day <br /> that outdoor activities would occur, from 5.5 hours /day under the <br /> proposed Project, to 4.25 hours /day under this alternative, by <br /> consolidating the 1st and 2 and the 3 through 5th grade morning <br /> recess times (Table 7.3 -1 on p. 95 of the Draft EIR). Under this <br /> alternative, noise levels would be incrementally higher during the <br /> morning recess period compared to the Project, but the overall <br /> daily average noise level would decrease because the daily <br /> student outdoor activities would be reduced by 1.25 hours <br /> compared to the proposed Project. Because this alternative <br /> involves the reduction of outdoor play time for the children that is <br /> further reduced than what the Project proposes (which already <br /> proposes a reduced outdoor play time of 90 minutes compared <br /> to the California Department of Education recommendation of <br /> 100 minutes of physical education per week per student), the City <br /> rejects this alternative as infeasible. <br /> ATTY /RESO.3003 /CC RESO CERT FEIR & ADOPTING SOUS <br /> REV: 07 -22 -14 VR <br /> Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.