|
8.B. - Page 80 ATTACHMENT 14
<br /> 22. Applicant shall implement dust control measures during site
<br /> preparation and construction as per Redwood City Building and Engineering
<br /> Department standards and pursuant to NPDES storm water pollution prevention
<br /> requirements. The Applicant shall comply with all applicable San Mateo County
<br /> Environmental Health Department regulations and State and Federal site
<br /> remediation regulations in order to ensure that there are no risks to human health
<br /> from any on -site contamination discovered during project excavation and /or
<br /> construction activities.
<br /> 23. If construction is not complete by the start of the wet season
<br /> (October 1 through April 30), the Applicant shall implement a winterization
<br /> program to minimize the potential for erosion and sedimentation. As appropriate
<br /> to the site and status of construction, winterization requirements shall include
<br /> inspecting /maintaining /cleaning all soil erosion and sedimentation controls prior
<br /> to, during, and immediately after each storm event; stabilizing disturbed soils
<br /> through temporary or permanent seeding, mulching, matting, tarping or other
<br /> physical means; rocking unpaved vehicle access to limit dispersion of much onto
<br /> public right -of -way; and covering /tarping stored construction materials, fuels, and
<br /> other chemicals. Plans to include proposed measures to prevent erosion and
<br /> polluted runoff from all site conditions shall be submitted for approval by CDD
<br /> prior to beginning construction. As site conditions warrant, the City Engineer
<br /> may direct the Applicant to implement additional winterization requirements.
<br /> 24. Applicant shall ensure that traffic control for lane closures will
<br /> conform to the Work Area Traffic Control Handbook. The Applicant shall submit a
<br /> traffic control plan for street closures to the Engineering Department for review
<br /> and approval.
<br /> 25. Where a Use Permit has not been used within one (1) year from the
<br /> date of granting, either by beginning of construction of the improvements or by
<br /> the initiation of the activity which is the subject of Use Permit, said Permit shall
<br /> automatically terminate and be of no further effect.
<br /> 26. Applicant shall defend (with counsel approved by City), indemnify,
<br /> and hold harmless the City, its agents, officers, and employees from and against
<br /> any claim, action, or proceeding against the City or its agents, officers or
<br /> employees, to attack, set aside, void, or annul an approval of the Project, including
<br /> without limitation any related application, permit, certification, condition,
<br /> environmental determination, other approval, compliance or failure to comply with
<br /> applicable laws and regulations, and /or processing methods ( "Challenge "). If
<br /> applicant does not promptly defend any Challenge, City may (but is not obligated
<br /> to) defend such Challenge as City, in its sole discretion, determines appropriate,
<br /> all at applicant's sole cost and expense. The applicant shall bear any and all
<br /> losses, damages, injuries, liabilities, costs, and expenses (including, without
<br /> limitation, staff time and in -house attorney's fees on a fully - loaded basis, attorney's
<br /> fees for outside legal counsel, expert witness fees, court costs, and other litigation
<br /> ATTY /RESO.3004 /CC RESO APPROVAL OF UP FOR 180 STUDENTS
<br /> REV: 07 -22 -14 VR
<br /> Page 6 of 8
<br />
|