My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-08 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-08 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2014 9:41:52 AM
Creation date
9/4/2014 6:52:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/8/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> September 8, 2014 <br /> SUBJECT <br /> Award of Contract — Jardin de Ninos Park Renovation <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Jardin de Ninos Park Renovation to Guerra Construction Group of <br /> Santa Clara, California for their responsive and responsible low bid in the amount of <br /> $254,520.00 and authorize the City Manager to increase the contract amount, if <br /> necessary, up to 10% of the amount awarded, not to exceed $279,972.00. <br /> BACKGROUND <br /> In April 2014, bids submitted for the renovation of Jardin de Ninos Park came in <br /> significantly above the cost estimate provided by Royston Hanamoto Alley & Abey <br /> (RHAA) and Council rejected all bids. City staff has worked closely with the landscape <br /> architecture design firm to re-package the Jardin de Ninos Park renovation plans and <br /> find ways to reduce costs. <br /> The major improvements to the park include the installation of a new pre-fabricated <br /> ADA-compliant restroom, the retrofit of the existing play structures, installation of new <br /> trees and rubber matting in the play area, installation of a new entry gate and <br /> modification to the existing fencing, and a new, larger plaza defined by a new <br /> mosaicked fountain. In addition, the plans include modifications and upgrades to the <br /> existing irrigation system, staining and water proofing the existing concrete seat walls, <br /> and painting the existing fencing. <br /> ANALYSIS <br /> Staff and RHAA assessed ways to reduce the cost of the project. Direct purchase of the <br /> pre-fabricated restroom building and the installation of utilities by City crew allowed for <br /> significant cost reduction. The project was re-advertised on August 22, 2014 without the <br /> bathroom and utility requirements. Staff anticipates authorizing construction to begin <br /> within 60 days of the award of this contract. The contractor scope of work includes <br /> grading and drainage, furnish and install of concrete paving and seat walls, entry gate <br /> and fencing, and fountain equipment and utilities, and coordination with the artist for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.