My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-08 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-08 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2014 9:41:52 AM
Creation date
9/4/2014 6:52:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/8/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 2 <br /> installation of the fountain. The park and adjacent street parking and sidewalks will <br /> necessarily be closed during the renovation and are expected to re-open for public use <br /> by July 2015. Construction will begin relative to the delivery of the pre-fabricated <br /> restroom which is one of several long lead time items. <br /> The three (3) bids received at the bid opening on August 27, 2014 are summarized in <br /> the table below: <br /> Contractor Bid <br /> 1. Guerra Construction Group $254,520.00 <br /> 2. Redwood Engineering Construction $337,191.00 <br /> 3. McNabb Construction $356,517.00* <br /> Engineer's Estimate: $263,000.00 <br /> Based on the three bids, staff believes that the bids are fair and reasonable. <br /> *Staff was notified by "third place" bidder of erroneous sum. The correct sum of <br /> $315,357.00 positions this bidder into second place. The correction has been recorded <br /> by the City Clerk. <br /> ALTERNATIVES <br /> Do not award the contract for Jardin de Ninos Park Renovation Project and re-advertise <br /> the project. <br /> FISCAL IMPACT <br /> Funds in the amount of $187,604.91 are available in the 2014/2015 CIP program under <br /> Jardin de Ninos Park Renovation Project. Funds in the amount of $110,624.70 are also <br /> allocated from the Restroom Replacement Program and $232,958.98 from the <br /> Playground Replacement Program. The total CIP funding amount is $531,188.59. <br /> ENVIRONMENTAL REVIEW <br /> The project is categorically exempt from the requirements of the California <br /> Environmental Quality Act (CEQA) Guidelines per Section 15302 "Replacement or <br /> Reconstruction" for removal and replacement of existing concrete paving, benches and <br /> playground equipment; and Section 15332 "In-Fill Development Projects" for the <br /> construction of additional concrete paving in the expanded plaza, placement of rubber <br /> matting and artificial turf, new restroom facilities, benches, lighting, and utility <br /> extensions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.