My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />Dynegy - South Bay Power Plant, Chula Vista, CA <br />Silverado was contracted by Dynegy <br />LLC to provide demolition services on <br />this 750 MW, four boiler fossil fuel <br />power plant. It was imploded bringing it <br />to a safe height for conventional <br />equipment to process and salvage all <br />the metals. Work included demolition <br />of two separate six million gallon fuel <br />oil tanks. In all, 17,000 tons of steel <br />was recycled. <br />Watch the implosion at <br />www.silveradocontractors.com <br /> <br />7.1.D. - Page 56
The URL can be used to link to this page
Your browser does not support the video tag.