My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> www.silveradocontractors.com <br />Petrochem Refinery, Ventura, CA <br />Project involved site remediation and clean up under the guidance of the EPA. Silverado faced <br />an aggressive schedule while removing over 35,000 lineal feet of process piping. Silverado's <br />contract included soil remediation, waste profiling and proper disposal. <br />AES Highgrove, <br />Highgrove, CA <br />Project consisted of <br />demolition of 4 <br />turbine generators, <br />concrete pedestals <br />and general site <br />grading of the 10 acre site. Hazardous materials abatement <br />was performed prior to their removal. Silverado was also <br />tasked with the removal of a 200,000 pound bridge crane. <br />AES Peaker Units, Long Beach and Huntington Beach, CA <br />Projects consisted of removal the internals of one gas-fired <br />Peaker Power Plant and the removal of two Peaker Plants. <br />The transformers weighed in excess of 800,000 lbs. <br />combined. <br /> <br />7.1.D. - Page 57
The URL can be used to link to this page
Your browser does not support the video tag.