Laserfiche WebLink
  <br /> <br /> www.silveradocontractors.com <br />Petrochem Refinery, Ventura, CA <br />Project involved site remediation and clean up under the guidance of the EPA. Silverado faced <br />an aggressive schedule while removing over 35,000 lineal feet of process piping. Silverado's <br />contract included soil remediation, waste profiling and proper disposal. <br />AES Highgrove, <br />Highgrove, CA <br />Project consisted of <br />demolition of 4 <br />turbine generators, <br />concrete pedestals <br />and general site <br />grading of the 10 acre site. Hazardous materials abatement <br />was performed prior to their removal. Silverado was also <br />tasked with the removal of a 200,000 pound bridge crane. <br />AES Peaker Units, Long Beach and Huntington Beach, CA <br />Projects consisted of removal the internals of one gas-fired <br />Peaker Power Plant and the removal of two Peaker Plants. <br />The transformers weighed in excess of 800,000 lbs. <br />combined. <br />  <br />7.1.D. - Page 57