My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> www.silveradocontractors.com <br />AVIATION San Francisco International Airport, Terminal 2 <br />Terminal 2 saw a complete gut out of the <br />500,000 square foot interior and all of the <br />exteriors removed to make way for a new <br />terminal for Virgin America. All work was <br />coordinated in conjunction with the active <br />FAA tower located directly above the work <br />area. <br /> <br /> <br />San Francisco International Airport, <br /> Boarding Area A <br /> <br />Boarding Area A saw a complete <br />demolition of 140,500 square foot <br />boarding area and its foundations. <br />Dust and debris control were critical <br />components due to working in active <br />AOA space. <br /> <br />Oakland International Airport, Taxiway D, Oakland, CA <br />Project consisted of demolition and disposal of approximately 8,000 cubic yards of existing <br />ACC and AC Pavement on Taxiway and Apron. <br />7.1.D. - Page 61
The URL can be used to link to this page
Your browser does not support the video tag.