My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> www.silveradocontractors.com <br />MARINE Berth 22, Port of Oakland, CA <br />Located in the San Francisco Bay Area, Silverado has performed numerous projects over water. Our <br />Port of Oakland marine demolition experience includes the removal of the 1,000 foot concrete wharf <br />at Berth 22, the removal of the 300 foot long wooden FDR Pier at Jack London Square, and the <br />retrofit of Berth 32/33, a 1,600 foot long concrete pier. <br />Maxwell Bridge, Napa, CA <br />Silverado demolished the lift span bridge at Imola Ave over the Napa river. The 1,100 ton structure <br />was picked in 5 segments. Following superstructure removal, Silverado removed concrete <br />foundations in coffer damns in the river. <br />7.1.D. - Page 60
The URL can be used to link to this page
Your browser does not support the video tag.