My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Subsequent to the slurry application, the majority of the project roadways will be <br />restriped/remarked similar to their original configuration. On certain streets, striping <br />changes will be made to increase the safety and comfort of people walking and <br />bicycling, consistent with the City’s complete streets goals. Any such changes will be <br />done in consultation with the City Council’s General Plan Subcommittee. Proposed <br />changes include the addition of class II bike lanes on Redwood Shores Parkway and <br />Shearwater Parkway. <br /> <br />Project streets are shown on the attached Project Location Maps. <br /> <br />Six (6) bids were received for the 2013-2014 Slurry Seal Project by the bid deadline on <br />August 14, 2014. The bid amounts are summarized in the table below. <br /> <br />Bidder Bid Amount <br />American Asphalt Repair and Resurfacing Co., Inc. $762,320.74 <br />VSS International, Inc. $802,000.00 <br />Graham Contractors, Inc. $820,215.47 <br />Telfer Highway Technologies $880,967.35 <br />Intermountain Slurry Seal, Inc. $989,898.00 <br />California Pavement Maintenance Co., Inc. $1,089,189.93 <br />Engineer’s Estimate $814,000.00 <br /> <br />The low bid was determined based on the Total Base Bid. The total base bid of <br />$762,320.74 from American Asphalt Repair and Resurfacing Co., Inc. is approximately <br />6% lower than the engineer’s estimate of $814,000.00 for the cost of construction. <br />Based upon the bids received, staff believes that the low bid of $762,320.74 is <br />reasonable and responsive, and recommends awarding the contract to American <br />Asphalt Repair and Resurfacing Co., Inc. <br /> <br />Construction is anticipated to begin in October 2014, and conclude by the end of 2014. <br />Notification of the proposed work will be mailed to area residents, property owners, <br />business owners, and schools in early October 2014. The contractor is required to <br />distribute an additional notice 14 days in advance of the start of work in each immediate <br />work area. Updates on the progress of construction will be available on the City’s <br />website. <br /> <br />ALTERNATIVES <br />Council may choose not to award the construction contract and direct staff to redesign <br />and/or rebid this project. <br />7.1.E. - Page 2
The URL can be used to link to this page
Your browser does not support the video tag.