My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Demolition and disposal of the Pan Am Barge includes but is not limited to the following: <br /> <br />1. Using appropriate safe practices, accept Pan Am Barge and proceed with its demolition and <br />disposal in a suitable manner. <br />2. This is a turn key project therefore the contractor is responsible for conducting a thorough site <br />survey and inspection of the Pan Am Barge, obtain all insurance and permits, meet all <br />regulatory requirements and execute in a safe manner. <br /> <br />Protection of Property / Public Safety <br />Contractor will do the following when completing Scope of Work and Services: <br /> <br />1- Confine operations at site to areas permitted by contract documents. <br /> <br />2- Do not encumber site with excessive material or equipment. The work site is in the proximity of <br />the marina entrance. Proposer shall include all traffic control and at no time prohibit safe access <br />to the marina by the marina users. <br /> <br />3- Do not impose any load on any pier, dock or structure that will damage or endanger structure. <br /> <br />4- Take precautions necessary to prevent annoyance to and maintain privacy of occupants adjacent <br />to or in the vicinity of the work. <br /> <br />5- Contractor is solely responsible for conditions of the job site, including safety of all persons, the <br />environment and property during performance of work. This requirement will apply continuously <br />and will not be limited to normal working hours. Safety and sanitary provisions shall conform to <br />applicable Federal, State, County, and local laws, regulations, ordinances, standards, and codes. <br />Where any of these are in conflict the more stringent requirement shall be followed. All public <br />and private property shall be safely guarded from injury or loss in connection with this contract <br />by the Contractor at all times. Should any facility, structure, or property be damaged during <br />operations of the Contractor, he/she shall immediately notify the proper owner or authorities. <br /> <br />6- The Contractor at his/her expense, shall rebuild, repair, restore, and make good to the City’s <br />satisfaction all injuries and damages resulting from his/her operations. <br /> <br />7- During performance of the work, the Contractor shall erect and maintain necessary temporary <br />fences, bridges, lights, barriers, or other safeguards (at Contractor’s expense) as shall be <br />appropriate under the circumstances in his/her judgment for the prevention of accidents; and <br />he/she shall take other precautions as necessary for public safety. <br /> <br />8- The Contractor shall keep a daily log of all staff and workers, including contact information, that <br />enter the marina. <br /> Pam Am Barge Removal Agreement <br />Page 8 of 8 <br /> <br />7.1.D. - Page 11
The URL can be used to link to this page
Your browser does not support the video tag.