My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RFP Pan Am Barge Removal – due 20 June 2014 Page 12 of 22 <br />Project Execution Plan. The Safety Plan, Project Execution Plan and Insurance Certificates must <br />all be approved by the City before actual work commences. <br /> <br />A rehearsal of concept with all parties will be required on land before the commencement of <br />actual work (Phase 1, 2, 3). <br /> <br />Being a Request for Proposal, the contractor is encouraged to use their expertise is devising a <br />cost effective, efficient and safe approach, meeting all regulatory requirements. <br /> <br />PHASE 1: MOVEMENT OF KLEIDER BARGE. During the removal of the Pan Am Barge, Contractor <br />shall temporarily relocate the Kleider Barge located in Berths 28/30 and move it back into <br />Berths 30/32 once the Pan Am Barge is removed. This process must be accomplished in one <br />day. <br /> <br />Relocation of the Kleider Barge includes but is not limited to the following: <br /> <br />1. Using appropriate safe practices, power boats of adequate quantity, size and power, move <br />Kleider Barge into an area just outside the dock and out of the path of the Pan Am Barge. <br />2. Hold at location while Pan Am Barge is removed from the marina. <br />3. Relocate Kleider Barge into Berths 30/32 and secure. <br />4. City staff will install new pre-constructed dock/stairs once Kleider Barge is secured. <br /> <br />PHASE 2: MOVEMENT OF PAN AM BARGE. The Pan Am Barge located in Berth 32 must be <br />permanently removed from the marina and delivered to a suitable location for demolition. <br /> <br />Movement of the Pan Am Barge includes but is not limited to the following: <br /> <br />1. Using appropriate safe practices, power boats of adequate quantity, size and power, move <br />Pan Am Barge to an area suitable for its demolition. <br />2. This is a turn-key project therefore the contractor is responsible for conducting a thorough <br />site survey and inspection of the site, obtain all insurances and permits, meet all regulatory <br />requirements and execute in a safe manner. <br /> <br />PHASE 3: DEMOLITION AND DISPOSAL OF PAN AM BARGE. Contractor shall remove the Pan Am <br />Barge to an acceptable location suitable for its demolition and disposal, selected and provided <br />by Contractor. <br /> <br />Demolition and disposal of the Pan Am Barge includes but is not limited to the following: <br /> <br />1. Using appropriate safe practices, accept Pan Am Barge and proceed with its demolition and <br />disposal in a suitable manner. <br />2. This is a turn-key project therefore the contractor is responsible for conducting a thorough <br />site survey and inspection of the Pan Am Barge, obtain all insurance and permits, meet all <br />regulatory requirements and execute in a safe manner <br />7.1.D. - Page 23
The URL can be used to link to this page
Your browser does not support the video tag.