My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Silverado Contractors, Inc. Page 2 <br /> <br />South Bay Power Plant, Chula Vista, CA: General Superintendent <br />General Superintendent for implosion of the 750 mega-watt, 4-unit natural gas fired <br />steam turbine electrical generation facility. During preparation for the implosion, work <br />included hazardous materials abatement, an administration building demolition, electrical <br />shop and catwalks removal as well as all of the ground level equipment removal. Due to <br />plants location on the Coast and active switching station, numerous agencies were <br />involved, including the California Coastal Commission. Once the plant was imploded, <br />approximately 20,000 tons of steel was recycled once the plant was brought down. <br />Contract Value: $6,000,000 / Client: Dynegy <br /> <br />Boeing Plant II Shoreline and Habitat Restoration, King County, Washington: <br />Assisted with design, request for proposals, contractors selection for dredging, shoreline <br />restoration, and disposal contract. <br />Contract value: $ 35,000,000 / Client: The Boeing Company <br /> <br />Boeing Plant II Site Development, King County, Washington: <br />Project entailed development of the 35 acre site post-demolition, including removal of <br />over 50,000 cy of impacted and contaminated soils and installation of a site-wide storm <br />water management system in an extremely stringent regulatory environment. <br />Contract value: $12,000,000 / Client: The Boeing Company <br /> <br />Boeing Plant II Demolition, King County, Washington: <br />Project entailed industrial demolition of over 1.7 million square feet of the former Boeing <br />Airplane Manufacturing Plant. Originally built in 1936, this plant produced Boeing’s B-17 <br />Flying Fortresses as well as many other aircraft. At 1.7 million square feet it required <br />extensive oversight to manage all asbestos abatement, PCB and soil remediation, <br />groundwater, and storm water issues on delicate Lower Duwamish Waterway, an EPA <br />designated Superfund site. <br />Contract value: $10,000,000 / Client: The Boeing Company <br /> <br />7.1.D. - Page 42
The URL can be used to link to this page
Your browser does not support the video tag.