My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> www.silveradocontractors.com <br />BUILDING DISMANTLING <br />680 Folsom Street, San Francisco, CA. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Silverado removed the core of the building as well as all 2,000 precast exterior wall panels. Each <br />7,000 pound precast panel was rigged and hoisted to ground by tower crane. <br /> <br />BART - Lake Merritt Administration Building, Oakland, CA <br />This was a complete dismantlement of the seven story building in downtown Oakland. Work occurred <br />directly above the active Bart Operations Center and Police Department located in the basement. The <br />BART Operations Center controls train speed and track switching for the entire system. <br />7.1.D. - Page 51
The URL can be used to link to this page
Your browser does not support the video tag.