My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> www.silveradocontractors.com <br /> Boeing Plant 2, Seattle, WA <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project consisted of complete removal of the <br />Boeing Plant 2 in Seattle, Washington. This <br />1.6 million square foot building was originally <br />used to build B-17 Bombers during World <br />War II. <br />Bank of America Clock Tower, <br />San Francisco, CA <br />Removal of 240' tall clock tower building on <br />Rincon Hill SF. Each floor plate pick <br />weighed approximately 53,000 lbs. Work <br />was performed in an extremely congested <br />site and required demolition of a 3 story <br />concrete wall directly adjacent to the active <br />Bay Bridge on-ramp. <br />7.1.D. - Page 52
The URL can be used to link to this page
Your browser does not support the video tag.