Laserfiche WebLink
  <br /> <br /> www.silveradocontractors.com <br /> Boeing Plant 2, Seattle, WA <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project consisted of complete removal of the <br />Boeing Plant 2 in Seattle, Washington. This <br />1.6 million square foot building was originally <br />used to build B-17 Bombers during World <br />War II. <br />Bank of America Clock Tower, <br />San Francisco, CA <br />Removal of 240' tall clock tower building on <br />Rincon Hill SF. Each floor plate pick <br />weighed approximately 53,000 lbs. Work <br />was performed in an extremely congested <br />site and required demolition of a 3 story <br />concrete wall directly adjacent to the active <br />Bay Bridge on-ramp. <br />7.1.D. - Page 52