Laserfiche WebLink
7.3.B. - Page 65 <br /> In addition, the DTPP program EIR (p. 16 -8) also noted that development occurring under the DTPP would be <br /> subject to damage due to the presence of corrosive soils within the DTPP area. Mitigation 16 -2 specifies that buried <br /> metal infrastructure have cathodic protecting using a sacrificial anode system that conforms to Part VII (G) of the <br /> City's water system design criteria and standard specification details Section 02661. Additionally, concrete mixes <br /> must conform to Caltrans specifications for Protection of Reinforcement Against Corrosion Due to Chlorides, Acids, <br /> and Sulfates as outlined in Memo to Designers 10 -5, January 2002. These measures, which shall be required as <br /> conditions of approval for the project, would reduce the potential impacts of corrosive soils on the project to a less - <br /> than- significant level. <br /> e. There would be no use of septic tanks or alternative wastewater disposal systems for the project. No impact would <br /> occur. <br /> Summary of Impacts <br /> Potentially Less than Significant Less than <br /> Significant With Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> VII. GREENHOUSE GAS EMISSIONS - Would the project <br /> a) Generate greenhouse gas emissions, either directly or indirectly, that may have X <br /> a significant impact on the environment? <br /> b) Conflict with an applicable plan, policy or regulation adopted for the purpose X <br /> of reducing the emissions of greenhouse gases? <br /> c) Expose people or structures to a significant risk of loss, injury or death X <br /> involving flooding caused by sea level rise resulting from global climate <br /> change? <br /> Documentation: [Note to Staff. Please verify construction duration (approximately 24 months ?). — Ray Pendro, MIGJ <br /> a. A limited amount of greenhouse gas (GHG) emissions would occur during demolition and construction <br /> activities. Excavation and construction are expected to last approximately 24 months. Due to the relatively small <br /> size of the site and the limited duration of construction, construction emissions for the project would not be <br /> substantial. Construction emissions would be temporary in nature and would not significantly contribute to <br /> regional GHG levels. In addition, the DTPP program EIR (pp. 13 -20 through 13 -23) determined that while the <br /> occupancy and operation of DTPP facilitated projects would generate GHG emissions, these emissions would be <br /> below the BAAQMD GHG emissions significance threshold and would be a less- than - significant impact. <br /> b. The project would not conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing <br /> GHG emissions (DTPP program EIR Chapter 13). The project is located in an area designated by the Association <br /> of Bay Area Governments (ABAG) as a "Priority Development Area" and would help accommodate anticipated <br /> growth as part of the regional Sustainable Communities Strategy for reducing GHG emissions. Therefore, no <br /> negative impacts on applicable GHG plans are anticipated. <br /> c. The DTPP program EIR (pp. 13 -22 and 13 -23) determined that the DTPP area could be subject to flooding due to <br /> sea level rise associated with global climate change, placing people, structures, and other improvements at an <br /> increased risk of injury or loss from flooding. Mitigation 13 -1 required that the City prepare strategies to respond to <br /> the impact of flooding, but acknowledged that given the unprecedented nature and uncertainty regarding this <br /> emerging issue, it could not be concluded that Mitigation 13 -1 would reduce this potential impact to a less -than - <br /> significant level. The City Council of Redwood City concluded that the environmental, social, economic, and other <br /> benefits of the DTPP override the significant adverse impacts of flooding due to sea level rise and adopted a <br /> Statement of Overriding Considerations to that effect. The proposed project is in compliance with all applicable <br /> DTPP regulations, and as a result, no additional sea level rise impacts beyond those identified and analyzed in the <br /> DTTPprogram EIR are anticipated. Through implementation of its General Plan policies - especially in the Built <br /> Environment, Public Safety, and Natural Resources chapters - the City continues to develop strategies and <br /> programs (including adaptation) for addressing anticipated sea level rise. <br /> 16 <br />