Laserfiche WebLink
7.3.B. - Page 66 <br /> Summar• of Impacts <br /> Potenlally Less than Significant Less than <br /> Significant With Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> VIII. HAZARDS AND HAZARDOUS MATERIALS -- Would the <br /> project <br /> a) Create a significant hazard to the public or the environment through the routine X <br /> transport, use, or disposal of hazardous materials? <br /> b) Create a significant hazard to the public or the environment through reasonably X <br /> foreseeable upset and accident conditions involving the release of hazardous <br /> materials into the environment? <br /> c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, X <br /> substances, or waste within one - quarter mile of an existing or proposed <br /> school? <br /> d) Be located on a site which is included on a list of hazardous materials sites X <br /> compiled pursuant to Government Code §65962.5 and, as a result, would it <br /> create a significant hazard to the public or the environment? <br /> e) For a project located within an airport land use plan, or, where such a plan has X <br /> not been adopted, within two miles of a public airport or public use airport. <br /> would the project result in a safety hazard for people residing or working in the <br /> project area? <br /> f) For a project within the vicinity of a private airstrip, would the project result in X <br /> a safety hazard for people residing or working in the project area? <br /> g) Impair implementation of or physically interfere with an adopted emergency X <br /> response plan or emergency evacuation plan? <br /> h) Expose people or structures to a significant risk of loss, injury, or death X <br /> involving wildland fires, including where wildlands are adjacent to urbanized <br /> areas or where residences are intermixed with wildlands? <br /> Documentation: <br /> a. The project would include 175 residential units and associated uses (e.g., leasing office, fitness center). It would not <br /> involve routine transport, use, or disposal of hazardous materials, nor would it result in hazardous emissions. The <br /> DTPP program EIR (p. 14 -12) concluded that while some hazardous substances may be generated, stored, <br /> transported, used, or disposed of in association with residential and non - residential development projects <br /> Downtown (e.g., cleaning supplies), existing local, State, and federal regulations and oversight would reduce the <br /> potential threat to a less- than - significant impact. <br /> b. & c. The proposed project would not create a significant hazard to the public or the environment through reasonably <br /> foresceable upset and accident conditions involving the release of hazardous materials into the environment. No <br /> manufacturing or industrial processes that utilize or produce dangerous substances are allowed under the DTPP, <br /> and the DTPP program EIR (p. 14 -12) concluded that —with mandatory local, State, and federal regulations in <br /> place - -the risk to the public or the environment from upset and accident conditions would represent a less-than- <br /> significant impact. <br /> d. The proposed project is not located on a site which is included on a list of hazardous materials sites compiled <br /> pursuant to Government Code §65962.5 (Cortese List) (Department of Toxic Substances Control [DISC] <br /> Envirostor database, www.envirostar.dtsc.ca.gov /public, viewed September 3, 2014; State Water Resources Control <br /> Board Geotracker database, geotracker.waterboards.ca.gov, viewed September 9, 2014. However, each database <br /> lists the same portion of the project site (referred to as the "Vanham Property') as a Leaking Underground Storage <br /> Tank (LUST) Cleanup Site whose status is "Completed— Case Closed:" <br /> The information below is taken directly from the Phase I Environmental Site Assessment for the proposed project <br /> (ENVIRONInternational Corporation, December 13, 2013). <br /> 17 <br />