Laserfiche WebLink
7.3.B. - Page 78 <br /> 2. A fire safety atagram showing building layout, exit locations, and other fire safety features will be posted in a <br /> conspicuous location on each floor. <br /> DTPP program EIR Mitigation 8 -1 requires the City to implement signal detectors at selected intersections as <br /> needed over time to provide priority traffic signal timing for emergency response vehicles; this program is <br /> underway. Also, a mandatory construction traffic routing and parking plan subject to City approval would be <br /> prepared to ensure that adequate emergency access is maintained during construction. As a result of the above <br /> discussion, the proposed project would not impair or interfere with emergency access„ and the impact is considered <br /> less than significant. <br /> f All required parking would be located on the two levels of the partially submerged, on -site parking garage (Plan <br /> Sheets A- 1.1and A -1.2). The garage would provide auto parking in excess of the minimum number required by the <br /> DTPP (202 vehicle spaces provided vs. 192 required, not including the future option of adding 24 stacker spaces, <br /> which would still total below the maximum number of spaces permitted by the DTPP). Also, the project plans (Sheet <br /> A -6.1) indicate that: (1) existing parallel parking on Wilson and the west side of Franklin would remain (Jefferson <br /> has no parking along the project frontage), and (2) existing parallel parking on the east side of Franklin (about nine <br /> spaces) would be replaced with an equal number of diagonal parking spaces. In addition, the project would meet the <br /> DTPP bike parking requirement (41 spaces) in a secured, on -site room, including a maintenance station. The <br /> proposed project would not result in inadequate parking capacity. <br /> g. Implementation of the proposed project would not require on- or oft-site improvements that would conflict with <br /> existing policies, plans, or programs that support alternative transportation. The project site is located less than <br /> one - quarter mile from a regional rail station (Caltrain) and bus depot (SamTrans). In addition, the proposed <br /> project would support both bike and pedestrian usage consistent with the DTPP, including secure bike parking and <br /> sidewalk improvements and landscaping, including public bike racks (Plan Sheet L -1.1). Moreover, as part of the <br /> proposed project a new crosswalk would be constructed along the eastern portion of the Franklin Street and <br /> Jefferson Avenue intersection, thereby improving pedestrian accessibility to shopping, transit and amenities, as well <br /> as to the downtown area as a whole. As a result, the proposed project would not have an impact on alternative <br /> transportation modes. <br /> Suminary of Impacts <br /> Potentially Less than Significant Less than <br /> Significant With Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> XV'II. LTTWITIES AND SERVICES SYSTEMS -- Would the project <br /> a) Exceed wastewater treatment requirements of the applicable Regional Water X <br /> Quality Control Board? <br /> b) Require or result in the construction of new water or wastewater treatment or X <br /> distribution facilities, or expansion of existing facilities, the construction of <br /> which could cause significant environmental effects? <br /> c) Require or result in the construction of a new storm water drainage facilities or X <br /> expansion of existing facilities, the construction of which could cause <br /> significant environmental effects? <br /> d) Result in the need for new or expanded water supply entitlements? X <br /> e) Result in a determination by the wastewater treatment provider that serves the X <br /> project area that it does not have adequate capacity to serve the project area's <br /> projected demand in addition to the provider's existing commitments? <br /> f) Be served by a landfill with insufficient permitted capacity to accommodate X <br /> the project's solid waste disposal needs? <br /> g) Fail to comply with federal, state, and local statutes and regulations related to X <br /> solid waste? <br /> Documentation: <br /> a. The DTPP program EIR (p. 10 -15) concluded that the South Bayside System Authority (SBSA, operator of the <br /> wastewater treatment plant that serves Redwood City) 10 year capital improvement program, initiated in 2008, <br /> 29 <br />