My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2014-084770 2808 El Camino Real (2)
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2014-084770 2808 El Camino Real (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2014 11:10:38 AM
Creation date
10/8/2014 11:10:35 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance
Doc Num
2014-084770
Rec Date
9/18/2014
Address
2808 El Camino Real
Parties
FSDW-Redwood City LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kensington Assisted Living <br /> Redwood City <br /> Bio-retention Area No.8 <br /> Inspection and Maintenance Checklist <br /> Property Address:250812526 El Camino Real.Redwood City.CA 94061 Properly Owner:Fountain Square Development West LLC <br /> Treahnent Measure No.: Nate of Inspection: Type of Inspection: I Monthly I Pre-Wet Season <br /> -After heavy runoff 7 End of Wet Season <br /> Inspector(s): -Other: <br /> Defect CondltIons When Maintenance is MatnUmance Conanatts(D.-ibc maintenance complaW Results Erpaded Whm <br /> Needed Ne-"?(yM) and ifncedcd maimenanccwas not conducted, Malmemance is Performed <br /> nom when it will be done) <br /> 1.Standing Water When water stands in the bio-retention There should be no areas of standing <br /> area between stoma acrd does trot drain water once inflow has ceased.Any of <br /> within five days alter i.&U. the following may apply:sediment or . <br /> trash blockages removed,improved <br /> grade from head to foot of bio- <br /> retentionarea,or added rmderdrair.. <br /> 2.Trash and Debris Trash and debris accumulated in the bio- Trash and debris removed from bio. <br /> Accumulation retention area, retenion area and disposed of <br /> properly. <br /> 3.Sediment Evidence ofsedimentatiotin bio- Material removed so that there is no <br /> remntim,area. clogging orblockaagge.Material is <br /> disposed ofproperly. <br /> 4.Erosion Channels have formed around inlets, Obstructions and sediment removed so <br /> there are areas of bare soil,and/or outer that water flows freely and disperses <br /> evidence of erosion. over a wide area.Obstructions ard <br /> sediment are disposed ofpropedy. <br /> 5.Vegetation Vegetation is dead,diseased and/or Vegetation is healthy and attractive in <br /> overgrown. eppc—.. <br /> 6.Mulch Mulch is mussing or patchv in All bare earth is covered,euept <br /> appearance.Areas of bare earth are mulch is kept 6 inches away from <br /> reposed a mulch layer is less than 3 monks of trees end shrubs.Mulch is <br /> inches in depth. even in appearance,at a depth of3 <br /> inches. <br /> 7.Miscellanea. Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the bio- <br /> retention me to function as designed <br /> REV:07-22-14 VR <br /> Page 22 of 26 <br /> ATTY/AGR.2014.129/17SDW-Redwood City LLC(2808 ECR)_STMMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.