My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2014-084770 2808 El Camino Real (2)
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2014-084770 2808 El Camino Real (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2014 11:10:38 AM
Creation date
10/8/2014 11:10:35 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance
Doc Num
2014-084770
Rec Date
9/18/2014
Address
2808 El Camino Real
Parties
FSDW-Redwood City LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kensington Assisted Living <br /> Redwood City <br /> Bio-retention Area No.9 <br /> hispection and Maintenance Checklist <br /> Property Address:280811826 El Camino Real Redwood City,CA 94061 Property Owner:Fountain Square Development West LLC <br /> Treatment Measure No.: Dateoflnspection: 'lypeoflnspection: I Monthly I Pre-Wet Season <br /> -After heavy runoff:1 End of Wel Season <br /> Inspector(s): -Other: <br /> Defect Coitllou When Maintenance is MaNletana Comments(D—ibc maintenance completed Results Expected When <br /> Needed tk,-d a,(ygy) and if—did meim—ee--at conducted hialmenance is Perrormed <br /> rate when it will be dart) <br /> 1.Staling Water When water stands in the bio-m entiaa There should be no areas of standing <br /> area between slomis and does net drain water once inflow has ceased Anyof <br /> within five days after rainfall. the following may apply sediment or <br /> trash blockages removed,improved <br /> grade from head to foot of bio <br /> retention area,a added uruladmins. <br /> 2.Trash and Debris Trash and debris aeetmmlat,d in flue bio- Trash and debris removed from bio- <br /> Accumulation retention area. retention area and disposed of <br /> properly. <br /> 3.Sediment Evidence of wdimentation in bio- Material removed so that there is no <br /> retention area. clogginng or blockage.Material is <br /> disposed of properly. <br /> 4.Erosion Channels have forted around inlets, Obstructions and sediment removed so <br /> there are areas of bare sdl,and/or other ihn[water flows freely and disperses <br /> evidence ar erosion over a wide area.Obstructions and <br /> sediment are disposed of propedy. <br /> 5.Vegetation Vegetation is dead,diseased and/or Vegetation is healthy and attracfivc in <br /> overgrown appearance' <br /> 6.Mulch Mulch is trussing a patchy in All bare earth is covered,except . <br /> appearance.Areas of bare earth are mulch is kept 6 inches away from <br /> exposed,or mulch layer is less than 3 tunas of tees and shmbs.Mulch is <br /> inches to depth. even in appearance,at a depth of 3 <br /> inches. <br /> 7.Miscellaneous Any condition net covered above that Meet the design speeifica6omn. <br /> needs attention in order for the bio- <br /> retention area to time tion ae,designed. <br /> REV:07-22-14 VR <br /> Page 23 of 26 <br /> ATTY/AGR.2014.129/FSDW-Redwood City LLC(2808 ECR)_STMMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.