My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 2:13:26 PM
Creation date
10/16/2014 4:39:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/20/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> October 20, 2014 <br /> SUBJECT <br /> Design Services Agreement with Verde Design, Inc. for the Red Morton Synthetic Turf <br /> Replacement and Tennis Court Reconstruction Project <br /> RECOMMENDATION <br /> Approve, by motion, the standard form design services agreement with Verde Design, <br /> Inc. for an amount not to exceed $243,397; and, authorize the City Manager to increase <br /> the contract amount up to 10% if necessary. <br /> BACKGROUND <br /> Red Morton Community Park is the City's premier recreational destination that hosts <br /> two softball fields, three baseball fields, three soccer fields, three community facilities, a <br /> skate park, playgrounds, as well as passive park space. <br /> Eight years ago, the City converted the grass athletic fields into synthetic turf surfaces. <br /> This has allowed for significant reductions in both staff resources needed to care for <br /> these types of fields as well as an estimated savings of 24 million gallons of water for <br /> the three fields over this eight year span. <br /> The synthetic turf fields have reached the end of their functional life, and there is a <br /> likely need to address subsurface stabilization and drainage issues. The playing fields <br /> are used year round for soccer, baseball, softball, football, and other field sports by <br /> both the local community and visiting tournaments. Because Red Morton Park is the <br /> main City park and is relied upon by the entire community for recreation and open <br /> space, coordinating the construction to minimize disruption to the community is an <br /> essential component of this project. Similarly, the tennis courts are relied upon for <br /> public play, tournaments, and lessons, thus requiring coordination and outreach to that <br /> specific community. For both the tennis courts and the athletic fields, a lighting study <br /> and recommended upgrades will also be addressed, including a study to add field <br /> lights to the one remaining athletic field (49er -Guida Field) that is currently not lit. The <br /> Project scope of services includes public workshops, project design and construction <br /> documents, project management, and construction observation for the Project. <br /> ANALYSIS <br /> After a Qualification Based Selection process, the Parks, Recreation and Community <br /> Services Department, along with Gilbane Building Company, acting as the contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.