My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 2:13:26 PM
Creation date
10/16/2014 4:39:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/20/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 15 <br /> 3. CONSULTANT's internal redline/ Quality Control review documents shall be <br /> made available to CITY upon request. <br /> 4. Coordinate and submit permit application(s), provide necessary drawings/ <br /> exhibits to obtain permit(s) for the Project as required, <br /> \TASK 4 — FINAL DESIGN (100% DESIGN SUBMITTAL) <br /> 1. Attend one (1) pre -final design review meeting with CITY to review comments for <br /> the 90% design submittal. <br /> 2. Incorporate CITY's 90% Design Submittal review comments. <br /> 3. Prepare Final Design Submittal consisting of complete construction documents <br /> specifications and cost estimates. <br /> 4. CONSULTANT's internal redline/ Quality Control review documents available to <br /> CITY upon request. <br /> 5. The Final Design Submittal shall be ready for signature and submitted to the City <br /> for review and approval. A marked set will be returned along with staff's <br /> comments and /or request for clarifications for revision. <br /> 6. Coordinate and obtain required permits and clearances from all necessary and <br /> required entities and agencies. <br /> 7. Provide one (1) set of full size plans and specifications for the project including <br /> the responsible engineer's wet stamp and signature with a license expiration <br /> date. <br /> 8. Provide an electronic copy of the drawings in AutoCAD as required and in PDF <br /> format, specifications in Word, cost estimate and probable construction schedule <br /> in Excel. <br /> TASK 5 — BID SUPPORT AND CONSTRUCTION SERVICES <br /> The following services shall be provided to CITY during the bidding process and <br /> construction phase of the project, which shall be provided in a manner consistent with <br /> City policies, practices, rules and procedures: <br /> 1. Provide design clarification responses during bid phase. <br /> 2. Contact potential bidders relative to the bid package. <br /> 3. Provide signed conformed contract document set incorporating addenda issued <br /> during the bid process and other changes subsequent to the Final Design <br /> Submittal. <br /> 4. Attend and conduct pre -bid conference. Respond to questions from prospective <br /> bidders. Assist in issuing addenda, as directed by the City. <br /> REV: 10 -03 -I4 MW <br /> Page 13 of i5 <br /> ATTY /AGR.2014.200Nerde Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.