Agmt14 Silverado Contractors, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Silverado Contractors, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2014 3:22:45 PM
Creation date
10/20/2014 3:22:44 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Silverado Contractors, Inc
PROJECT NAME
Movement and relocation of Klieder and Pan Am Barge
Date
10/17/2014
MO Ref
14-145
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. _�I _ -____ .._-- <br /> Exhibit A— Scope of Work <br /> 1. Scope of WorW Tasks Deadline—60 davs after NTP <br /> PROJECT WORK: <br /> All required work must be completed within sixty (60) days from the date of Notice to Proceed is <br /> issued. Any work that is not finished or completed by the end of the aforementioned time frame will <br /> result in payment of liquidated damages, as outlined in Attachment B (Liquidated Damages), by the <br /> Contractor to the City. <br /> Unless otherwise specified, all work includes materials, equipment and labor. <br /> PHASE 1,2 AND 3 ARE TO BE COMPLETED AS A TURNKEY PROJECT BY CONTRACTOR. <br /> This will be a turnkey project with Contractor responsible for all permits, licenses, insurance, fees <br /> and costs. <br /> Within ten(10)days of Notice of Award,and prior to execution of the Contract by the City,Contractor <br /> must submit for review and approval, insurance certificates, a Safety Plan and a Project Execution <br /> Plan.The Safety Plan,Project Execution Plan and Insurance Certificates must all be approved by the <br /> City before actual work commences. <br /> A rehearsal of concept with all parties will be required on land before the commencement of actual <br /> work(Phase 1, 2, 3). The rehearsal of concept is a walk through and will not require equipment. <br /> PHASE 1: MOVEMENT OF KLEIDER BARGE. During the removal of the Pan Am Barge, <br /> Contractor shall temporarily relocate the Kleider Barge located in Berths 28/30 and move it back into <br /> Berths 30/32 once the Pan Am Barge is removed. This process must be accomplished in one day. <br /> Relocation of the Kleider Barge includes but is not limited to the following: <br /> 1. Using appropriate safe practices, power boats of adequate quantity, size and power,move <br /> Kleider Barge into an area just outside the dock and out of the path of the Pan Am Barge. <br /> 2. Hold at location while Pan Am Barge is removed from the marina. <br /> 3. Relocate Kleider Barge into Berths 30/32 and secure. <br /> PHASE 2: MOVEMENT OF PAN AM BARGE. The Pan Am Barge located in Berth 32 must be <br /> permanently removed from the marina and delivered to a suitable location for demolition. <br /> Movement of the Pan Am Barge includes but is not limited to the following: <br /> 1. Using appropriate safe practices, power boats of adequate quantity, size and power, move Pan <br /> Am Barge to an area suitable for its demolition. <br /> 2. This is a turn key project therefore the contractor is responsible for conducting a thorough site <br /> survey and inspection of the site, obtain all insurances and permits, meet all regulatory <br /> requirements and execute in a safe manner. <br /> PHASE 3: DEMOLITION AND DISPOSAL OF PAN AM BARGE. Contractor shall remove the <br /> Pan Am Barge to an acceptable location suitable for its demolition and disposal,selected and provided <br /> by Contractor. <br /> ATTY/AGR/2014.166/SILVERADO CONTRACTORS-PAM AM BARGE REMOVAL <br /> REV:09-09-14 VR <br /> Page 7 of 8 <br />