My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Bellecci & Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Bellecci & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2014 3:15:59 PM
Creation date
10/24/2014 3:15:57 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bellecci & Associates
PROJECT NAME
Research Right of Way along Middlefield Rd prepare preliminary streetscape design alternatives
RMP File Number
304.5
Date
10/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ._. IIII��� I I "- <br /> 4 ,_ , � <br /> TASK 8(OPTlONAL SERVICE)—LANDSCAPE ARCHITECTURE MEETING#1+COORDINATION <br /> Upon written approval from the City Engineer,Consultant will engage Landscape Architect to perForm early design <br /> tasks. <br /> 8.a Attend City Staff Meeting#1. <br /> 8.b Coordinate with civil engineer on design issues and landscape design options. <br /> TASK 9(OPTIONAL SERV►CE)—LANDSCAPE ARCH/TECT ENLARGEMENT SKETCHES <br /> 9.a As part of the aRernatives design phase Landscape Architect will assist by providing enlargement <br /> sketches of key areas where private property encroachments reach into the streetscape area. <br /> The enlargement sketches are intended to assist with City staff and design team decision making for alternatives <br /> and the impact of the private property existing facilities. <br /> Task 9 Deliverables:Three Enlargement Sketches for two alternatives—two hard copy sets and PDF <br /> TASK 10(OPTIONAL SERVICE)—FLYNN TO MACARTHUR STREET5CAPE LAYOUT <br /> The segment of Middlefield Road that is the frontage of Costco is completed.The segment south of Costco will be <br /> part of the Streetscape study and is intended to blend with the County's streetscape project to the south which is <br /> currently in design by the County. <br /> 10.a Consultant will contact the County to obtain County streeucape design. <br /> 10.b Consultant will prepare a preliminary geometric layout of the sidewalks, curb, bulbouts and <br /> striping for this segment of Middlefield. The cross section will be initially based on the county's <br /> streetscape cross-section, with adjustments to lane widths and sidewalk widths after the first meeting <br /> with the City. <br /> Task 10 Deliverables:Geometric Layout Plans—two hard copies,PDF,and AutoCAD files <br /> TASK li(OPTfONAL SERVICE)—ADDITIONAL MIDDLEFIELD ROAD RlGHT OF WAY RESEARCH <br /> After completion of Task 1, it is expected there will be consistent findings on the right or way widening status on <br /> Middlefield Road. If the results are mixed the City may elect to authorize additional County research of the <br /> Middiefield Road Property lines. <br /> Schedule <br /> TASK DAYS <br /> 1 RIGHT OF WAY ANYALISYS 17 <br /> 2 STREETSCAPE LAYOUT DRAFT ALTERNATIVES 21 <br /> 3 MEETING WITH CITY STAFF#1 5 <br /> 4 REFINE TWO STREETSCAPE LAYOUT ALTERNATIVES&COST ESTIMATE 14 <br /> 5 MEETING WITH CITY STAFF#2 5 <br /> 6 FURTHER REFINE ONE STREESCAPE LAYOUT ALTERNATIVE&COST ESTIMATE 14 <br /> 7 LANDSCAPE ARCHITECT MEETING&GRAPHIC RENDERING 14 <br /> 8 LANDSCAPE ARCHITECTURE MEETING#1+COORDINATION 14 <br /> 9 LANDSCAPE ARCHITECT ENLARGEMENT SKETCHES 14 <br /> 10 FLYNN TO MACARTHUR STREETSCAPE LAYOUT 14 <br /> 11 ADDITIONAL MIDDLEFIELD ROAD RIGHT OF WAY RESEARCH 10 <br /> REV:10-03-14 VR <br /> Page 12 of 13 <br /> ATT'Y/AGR.2014.201/Bellecci&Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.