Laserfiche WebLink
Demobilization <br /> Upon the conclusion of the field activities, project staff will breakdown and remove all <br /> materials and equipment from the site in a timely manner. Power-washing of the <br /> asphalt surface may be performed to remove residuals. All general refuse will be <br /> removed from the site for disposal. All IDWs including soil cutting, groundwater <br /> development water and sampling purge water will be drummed and staged onsite for <br /> classification and disposal . <br /> Proposed Implementation Work Schedule <br /> Action Duration (Weeks) <br /> Pilot Test Field Activities 1 .5 - 2 <br /> ATTY/AGR/2016/AMENDMENTS/AMEND NO. 1 REGENCY — SEQUOIA STATION ACCESS AGREEMENT <br /> REV: 09-29-16 VR <br /> Page 5 of 5 <br />