My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2015 12:55:17 PM
Creation date
11/18/2014 5:00:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design, Inc.
PROJECT NAME
Design Services for Red Morton Synthetic Turf Replacement and Tennis Court Reconstruction Project
RMP File Number
304
Date
11/12/2014
MO Ref
14-157, 15-079
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ �.�` _ <br /> 2. De�ne geotechnical investigation pa�-ameters and provide to CITY#o acquire <br /> geotect�nical report for use in the design of the Project. <br /> 3. Revie�w as-built/record documents and o#her perkinen#reparts/documents <br /> relevant to the Project site. <br /> 4. Provide digital topographic survey for the Proje�t. <br /> 5. Develop exis�ing conditions base pian far the Project. <br /> 6. Goo�rdinate with CITY Community Develr�pment Depafiner�t staff to de�ne, <br /> research and caordinaie envirvnmental review, CEQA aomplianc:�s, coordirtation, <br /> process and ob#ain cert�cations required by ttre State,CITY and other <br /> responsib�e entities f�r#he Project. <br /> 7. Determine methodotogy for synthetic#urf material seiection aax�ptable to CITY. <br /> TASK 2-1NITIAL QE31GN (50°lo DESIGN SUBMtTTAL) <br /> This initia!design wiil be used as#he 6asis for the developmen#t►f the Finai Design. The <br /> tasks Cansuftant shall complete inciude, but are nof limited to,the fpllowing: <br /> 1. Attend one mee#ing wi#h CITY to review findings and Praject recammendations <br /> firom TASK 1. Provide meeting agenda and m�eting minutes for review by GITY. <br /> 2. Set-up CAD background files and appiicable draw[ng sheets for Project. <br /> 3. Develap 50°k Cons#ruction Documen#{CD)Submit#a! package{three hard copy <br /> sets and 1 ele�onic pdf�ie). The pack�ge wiil include, but not be limited to,the <br /> foilowing: <br /> a. Caver sheet <br /> b. E�sting conditions plans <br /> c. Demolition pians <br /> d. Grading and drainage plans <br /> e, Layout/material plans <br /> f. Elect�ical drawings <br /> g. Constntction detaiis <br /> h. T�chnical speci#ications <br /> i. Identification of possible staging areas <br /> j. Tempc�rary c�nsirut�ion easements <br /> k. Gener�l and construction notes <br /> i. Construdion phasing options <br /> m. Preliminary statement of probable c�nstruc�ion costs. <br /> 4. Design calculafians and analysis will include all c�f the foqowing: <br /> a. Engtneering calculations; <br /> b. Any miscellaneous technical data; <br /> �, Maintenanc�e consideratians; and, <br /> d. Catalr�gue cu�for any special equiprnent. <br /> REV:30-03-14 MEG <br /> Page!1 of 15 <br /> ATTYJAGR.2014,200Nerde Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.