EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> Consultant shall provide wastewater flow monitoring services as part of the City's annual flow <br /> monitoring program as described in more detail below. Services shall be provided at the nine <br /> (9)sites listed below. <br /> Task Description <br /> Task 1. Perform field reconnaissance and document review <br /> Consultant shall review available plans and documents, and conduct field <br /> reconnaissance of the proposed flow monitoring sites identified by the City. The <br /> reconnaissance shall assess hydraulic conditions, manhole access, traffic control <br /> requirements, and safety issues for each site. No modifications to the proposed meter <br /> sites shall be made without prior review and approval by the City. <br /> Deliverable: Consultant shall submit documentation of site reconnaissance and final <br /> flow monitoring sites to the City by November 19, 2014. <br /> Task 2. Installation/Calibration/Maintenance/Removal of Flow Monitors: <br /> Consultant shall install nine (9)flow meters and one (1) rain gauge for a period of sixty <br /> (60) days starting no later than December 4, 2014, with an option to extend the <br /> monitoring on a weekly basis up to one additional month. The flow meters will be area- <br /> velocity type capable of ineasuring flows and flow depths under surcharge conditions. <br /> Pipe diameters will range from approximately 8 to 21 inches. Rain gauges will be <br /> tipping bucket type capable of recording to 0.01 inches. The flow monitoring locations <br /> are listed as follows: <br /> • Meter 1: Brewster Avenue (12-inch diameter) <br /> • Meter 2: Easement at the back of newly built housing complex near the <br /> Salvation Army building (18-inch diameter) <br /> • Meter 3: Industrial Way and Whipple Avenue (10-inch diameter) <br /> • Meter 4: James Avenue and Clinton Street(15-inch diameter) <br /> • Meter 5: Hudson Street and Lincoln Avenue (18-inch diameter) <br /> • Meter 6: Fairview Avenue and Alley (12-inch diameter) <br /> • Meter 7: Roosevelt Avenue and Fairview Avenue (15-inch diameter) <br /> • Meter 8: Roosevelt Avenue befinreen Hudson Street and Grand Street <br /> (8-inch diameter) <br /> • Meter 9: Roosevelt Avenue and Hudson Street(21-inch diameter) <br /> The flow meters and the rain gauge shall be installed at the approved sites and visited <br /> weekly during the monitoring period. Consultant shall report to the City within 24 hours <br /> of each site visit if any meter has malfunctions or otherwise fails to provide good data, <br /> or if changes in site conditions have impacted collection of good data. Field calibration <br /> data (independent measurements of flow depth and velocity) shall be collected <br /> throughout the monitoring period for each meter to verify monitor accuracy over a <br /> range of flow depths. The flow data will be collected at 5-minute intervals and reported <br /> at 15-minute intervals. The meters will be interrogated at each site visit and the data <br /> (considered preliminary)will be p�ovided to the City for review on a weekly basis within <br /> REV:11-03-14 VR <br /> Page 10 of 12 <br /> ATTY/AGR.2014.217/V&A Consulting Engineers Inc. <br />