My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 V & A Consulting Engineers Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 V & A Consulting Engineers Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 5:26:02 PM
Creation date
11/18/2014 5:26:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
V & A Consulting Engineers Inc.
PROJECT NAME
Wastewater flow monitoring services City's annual flow monitoring program
RMP File Number
304.5
Date
11/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
three (3) days after interrogation. At the City's discretion, the data submittals may be <br /> reduced to a biweekly basis after the first two (2)weeks if the initial data appears to be <br /> good. The final data shall be compiled following removal of the flow meters and the <br /> rain gauge. In the event that more than one flow meter fails to provide usable data <br /> during a significant storm event (> 0.5 inches of rainfall in 24 hours), Consultant shall <br /> extend the monitoring period for up to two (2)weeks at no additional cost to the City. <br /> Deliverable: Consultant shall provide the City with a Flow Monitoring Report (3 copies) <br /> containing site details and pictures;field installation and maintenance sheets including <br /> calibration data; depth-velocity scatter plots; 7-day plots of flow for each meter and <br /> rainfall for each r�in gauge; and summary tabulation of daily average, minimum, and <br /> peak flow for each flow meter. Electronic files shall be submitted in Excel format <br /> containing depth, velocity, and flow rates for each meter and rainfall for each rain <br /> gauge in 15-minute intervals. Final report and data shall be delivered within three (3) <br /> weeks of completion of flow monitoring. <br /> Consultant shall perForm all the worlc in the best workmanlike manner, conforming to all <br /> applicable standards, specifications, codes, laws, and regulations. Consultant shall take all <br /> necessary safety precautions and comply with all applicable Federal, State, and local <br /> regulations including those relevant to work in confined spaces. Consultant shall comply with all <br /> applicable traffic control requirements including those of the City or agency with jurisdiction over <br /> the meter sites. <br /> TIME SCHEDULE <br /> Consultant shall meet the scheduling requirements as described in the Scope of Worlc and the <br /> scheduling milestones as follow: <br /> Site Reconnaissance of inetering sites: November 14,2014 <br /> Documentation of Field Reconnaissance: November 19, 2014 <br /> Approval of Sites by City(if changes are required): November 26, 2014 <br /> Meters and rain gauge installed and operating: December 4, 2014 <br /> First data batch reported to City: December 19, 2014 <br /> Meters Removed: February 6, 2015 <br /> Final Report: February 27, 2015 <br /> The removal of the flow meters and the submission of the�nal report may be delayed if the City <br /> extend the flow monitoring period. <br /> FEE SCHEDULE <br /> City shall pay the consultant the following amount to install nine(9)flow monitoring meters and <br /> one(1) rain gauge for 60 days period and an option to extend the flow monitoring period to up to <br /> one month as follows: <br /> The Consultant shall be paid per percentage of work accomplished at the end of the month. <br /> A Direct Labor Costs <br /> Field Reconnaissance/Document Review/Wet Weather Flow <br /> Monitoring /Data Analysis and Flow Monitoring Report------ 24 438.00 <br /> Subtotal (Direct Labor Costs) $24,438.00 <br /> REV:11-03-14 VR <br /> Page ii of 12 <br /> ATTY/AGR.2014.217N 8�A Consulting Engineers Ina <br />
The URL can be used to link to this page
Your browser does not support the video tag.