Laserfiche WebLink
B. Other Direct Costs <br /> CSE Truck&Equipment-------------------------------$910.00 <br /> Mileage---------------- -------------------=------------$314.00 <br /> Flow Meters------_�___�________�____�_____�______$15,300.00 <br /> RainGauge--------------------------------_----------------_—____----$400.00 <br /> Batteries__���__----------------------���----------------------$432.00 <br /> Field Materials------------________��_�__�_______��___�_$150.00 <br /> Office Expenses--____________________�_�__w___��____� 56.00 <br /> Subtotal (Other Direct Costs) 17 562.00 <br /> Total fixed cost �42,000.00 <br /> C. Optional Costs (not part of fixed cost) <br /> Weekly extensions of flow meters and rain gauge, if required, <br /> shall be provided by consultant for the additional amount <br /> of$4,500.00 per week.-----------______�__�____�__��_______�_____$18,000.00 <br /> Total not to exceed contract amount(including additional one month period <br /> of flow monitoring in addition to the 60 days specified if required.)---------------------�60,000.00 <br /> REV:11-03-14 VR <br /> Page 12 of 12 <br /> ATTY/AGR.2014.217N 8�A Consulting Engineers Inc. <br />