My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
PRC MIN 1978-03-08
RedwoodCity
>
Park and Rec Commission
>
Parks & Rec Comm Minutes
>
1970-1978
>
1978
>
PRC MIN 1978-03-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2014 8:00:37 AM
Creation date
12/4/2014 8:00:35 AM
Metadata
Fields
Template:
Park and Rec Comm
Park and Rec Comm - Document Type
Minutes
Date
3/8/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_..��.....�_....��.. _ <br /> � � ' � � <br /> , . <br /> PaRKS & RECREAT�IaN DEP#Ri'M�Nfi:MO�ITHLY RE�PO�T � <br /> . pESIGN AND DEVELt�FI'1ENT <br /> h1ARCH 1978 <br /> Red Morton Park <br /> The design of the picnic facilities and th-e play apparatus areas which <br /> are to be a part of the Phase IV deve�'opment is now underway. Initial <br /> meetings ha�re been held with the lajndscape architectural firm of Singer <br /> & Hodges relative to the preliminary sketches. Further engineering data <br /> is being collected for them in order tha.t they might praceed with this <br /> ' work in greater detail . <br /> ` Proposals from several electricallengineering firms have now been received <br /> relative to the design of the new 7ighting for the Sechet-Griffin athletic <br /> fields. These proposals are currently 4eing reviewed by the staff and a <br /> selection committee from the Parks & Recreation Commission will be meet- <br /> ing in early April for reco�mtenddtions for the consultant to perform the <br /> work. A contract will then be ex�cut�d `and design work will soon be <br /> underway for the electrical design.. ' <br /> Redwood Shores � <br /> The occasional rain storms which have b�en experiertced during the month <br /> of March have delayed the comp.letion af ttie minor grad�ing work which <br /> remains prior to final acc,eptance of the work. As soon as the area <br /> dries sufficiently to allow equiprr�nt into the area, this will be com- <br /> pleted. <br /> The tennis coart lighting has been installed, inspected, and approved. <br /> Schedules for applying the �finished coating surface to the courts have <br /> also been delayed du�e to the rainy conditions. This work will be com- <br /> pleted as soon as weather permits and final inspection and acceptance <br /> will be made for the courts. <br /> Plans and specifications are currently being assembled to proceed with <br /> ' the calling for bids for the turfin� and landscaping for the new park <br /> areas commensurate with available funds to accomplish this landscaping <br /> of the area. <br /> � Palm Park <br /> The plans and specifications for the Palm Park project are now complete <br /> and have been assembled for Counc'il approva] and authorization to ca11 <br /> for bids. This request will be before the City Council at their meet- <br /> ing of April 10, 1978, and bids will be received by the �nd of April <br /> for this proposed work. <br /> -b- <br />
The URL can be used to link to this page
Your browser does not support the video tag.