Laserfiche WebLink
i f <br /> � � <br /> PARKS & RECREATION DEPARTMENT MONTHLY REPORT <br /> DESIGN & DEVELOPMENT <br /> NOVEMBER 1978 <br /> Redwood Shores <br /> A final inspection for the acceptance of the turfing and landscape work <br /> for the new park areas at Redwood Shores was held November 30, 1978. <br /> The smaller park areas have been accepted and with the exception of <br /> minor clean-up work to be completed, the four-acre site will be accepted. <br /> There was some delay due to the inclement weather in November which <br /> hindered turf repair; however, it is felt this will not hold up final <br /> acceptance of all of the areas. The maintenance of all of the new park <br /> areas will be transferred to the park division personnel by the first <br /> of the year. <br /> Palm Park <br /> The work at Palm Park is nearly 90� completed. All that remains is <br /> for the construction of the small shelter and the planting of the shrubery <br /> in the shrub bed areas around the park. The small sidewalk to the rear <br /> of the park together with the fence access point are yet to be completed. <br /> The rains during the month of November delayed the progress on the project; <br /> however, every effort is being made to expedite the work so that completion <br /> can be realized as soon as possible. <br /> Canyon Park <br /> The application for State funds from the SB174 Block Grant Program con- <br /> tinues to await the approval of the State Department of Parks & Recrea- <br /> tion. There has been some delay in receiving the necessary documents <br /> from the State Clearing House for this project. As soon as approval is <br /> granted, every effort will be made to expedite the project. <br /> Red Morton Park <br /> There have been a few minor changes in the design for the new lighting <br /> at the ball fields and also in the design of the picnic area and play <br /> apparatus area. These changes are noa� being considered by the consul- <br /> tants and are being finalized in preparation for final review and <br /> acceptance of the plans and specifications. Current schedules indicate <br /> that these projects should be available for bidding the latter part of <br /> January. <br /> -8- <br />