Laserfiche WebLink
9.B. - Page 4 <br /> ANALYSIS <br /> Downtown Precise Plan Implementation Strategy <br /> The Downtown Precise Plan's success is due in large part to its market and form based <br /> approach. Rather than dictate the exact type of land use to be constructed on each <br /> parcel, the DTPP primarily focuses on the appearance/form of the buildings and <br /> surrounding environment. While there are several land-use regulations (for example, <br /> retail requirements along Broadway), the DTPP primarily relies on the property owners <br /> and developers to determine what should be constructed on their property. These <br /> determinations are made by expected consumer demand. <br /> While there is land use flexibility on a parcel by parcel basis, the DTPP had to define a <br /> "project" in terms of maximum levels of permitted development, to comply with CEQA's <br /> environmental review requirements. In other words, a certain number of housing units, <br /> office space, retail space and hotel rooms were be specified in the DTPP EIR in order to <br /> measure potential impacts. The total demand for each use was estimated based on <br /> economic studies conducted during the plan formulation stage, which happened to be <br /> when the region and nation were in a deep recession. Fortunately, economic conditions <br /> have changed dramatically since that time, which has impacted consumer demand for <br /> specific development categories. <br /> As noted earlier, the Downtown Precise Plan requires that the Council consider a DTPP <br /> amendment when any development category reaches the 80% threshold of MAD <br /> limitations. By tying the review to an individual development category threshold (rather <br /> than the entire MAD), the DTPP allows the Council to consider increasing or adjusting <br /> the MAD in each category when market conditions favor one development category <br /> over another. In this case, demand for office space is outpacing other development <br /> categories, as compared to what was originally projected at the time of plan adoption. <br /> Preliminary Environmental Review Results <br /> At that September 22, 2014 City Council meeting, it was noted that there are several <br /> options the Council has for moving forward given the amount of office development <br /> proposed in relation to the MAD limitations: <br /> • The first option would be to move forward with a "major amendment" to the DTPP <br /> limitations. In other words, Downtown Precise Plan "Phase 2", where the MAD <br /> limitations could be considered in their entirety. The result of this process could <br /> be new/increased MAD limitations being set for all categories of development. <br /> However, increases in the MAD in all categories would almost certainly require <br />