My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Environmental Water Mgmt
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Environmental Water Mgmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2008 5:16:22 PM
Creation date
5/10/2004 11:08:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Water Management
PROJECT NAME
irrigation water management
RMP File Number
304.5
Date
4/19/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> -'-~"_.., <br /> increased conservation emphasis, contractors must improve <br /> maintenance operations. <br /> Consultant will develop handouts and slide presentation for a seminar <br /> that: <br /> A. Describes best management strategies for irrigation systems. <br /> B. Presents findings from BMP-5 surveys in Redwood Shores. <br /> C. Provides a forum for landscape contractors to give their BMP-5 <br /> program feedback and experiences with management of <br /> irrigation system in the Shores. <br /> Tentative Schedule: Duration two morning hours in the spring. <br /> 2. 1st Step Recycled Water System <br /> 1 st Step Monitorinq Proqram <br /> A. Monitor existing 1 st Step System connections particularly <br /> private sector customers. <br /> B. Review water, plant and soil testing. <br /> C. Provide irrigation system inspections and plant evaluations as <br /> and if needed. <br /> Tentative Schedule: Ongoing from March through June 30, 2004. <br /> 3. Recycled Water Project <br /> 3-a Enqineers Report and Operations Manual <br /> Objective: Provide irrigation and site specific expertise to team writing <br /> Engineer's Report, Operations Manual and permitting efforts. <br /> Specific areas of concentration include site retrofits and connection <br /> procedures. Consultant will provide detailed: <br /> A. Site retrofit processes. <br /> B. Operation and maintenance for site supervisors. <br /> C. Operation and maintenance for RWC staff. <br /> 3-b Recvcled Water Pricing <br /> 2 of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.