My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigated Negative Declaration <br /> American remains shall comply with CEQA Guidelines Section 15064.5(e).The note on <br /> the plans shall be subject to review and approval of the Planning Services. <br /> P subject PP g <br /> Geology and Soils <br /> Mitigation Measure GEO-1: Prior to the issuance of project Building Permits, the <br /> applicant shall submit plans and specifications complying with all of the <br /> recommendations of the Geotechnical Investigation and Pavement Design Report <br /> (September 2012) prepared for the project. At a minimum, the plans shall specifically <br /> include the following measures to address the impacts from native surface soils with <br /> high expansion potential: <br /> 1. Mat foundations shall have a minimum thickness of 12 inches and be properly steel <br /> reinforced. <br /> 2. Building pads shall be underlain with a minimum of 12 inches non-expansive fill <br /> layer or 12 inches of lime-treated native soil material. This layer shall be compacted to <br /> at least 90 percent relative maximum density. <br /> 3. When continuous perimeter and isolated interior spread footings are used,they must <br /> be founded at a minimum depth of 24 inches below rough soil pad.Both interior and <br /> perimeter foundations should be founded at the same elevation below pad grade <br /> with the exception of any soil retaining structure foundations. <br /> 4. Footing excavation shall be saturated with water(but not overly saturated) and <br /> continue to be periodically saturated after footing excavation and prior to concrete <br /> placement. <br /> 5. Prior to the issuance of project Grading and Encroachment Permits,the applicant <br /> shall submit a supplementary letter from the GeotechnicaI Engineer regarding the <br /> recommended pavement section(s) for permeable pavement. <br /> Hazards and Hazardous Materials <br /> Mitigation Measure HAZ-1:Prior to demolition, a complete asbestos survey shall be <br /> conducted in accordance with National Emissions Standards for Hazardous Air <br /> Pollutants (NESHAP) guidelines.All suspect asbestos-containing materials (ACMs) shall <br /> be sampled to determine the presence or absence of asbestos prior to building <br /> demolition activities. If ACMs are found, a licensed asbestos abatement contractor shall <br /> be retained to abate the identified ACMs. <br /> Mitigation Measure HAZ-2: Prior to demolition, a comprehensive lead based paint <br /> (LBP) survey shall be conducted. If any LBP is identified,it shall be removed from the <br /> site in accordance with all applicable regulations,including California Division of <br /> Occupational Safety and Health(Cal/OSHA) Lead in Construction Standard, as included <br /> in California Code of Regulations,Title 8, Section 1532.1, during demolition activities. <br /> These requirements include employee training, employee air monitoring, and dust <br /> control. If lead paint is peeling,flaking or blistered, it shall be removed prior to <br /> demolition.It is assumed that such paint will become separated from the building <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.