Laserfiche WebLink
Mitigated Negative Declaration <br /> components during demolition activities and could become air-borne;therefore,it shall <br /> be managed and disposed as a separate waste stream.Any debris or soil containing lead <br /> paint or coat shall be disposed at landfills that are permitted to accept the waste being <br /> disposed. <br /> Hydrology and Water Quality <br /> Mitigation Measure HYD-1:All project grading, construction, and subsequent <br /> operations shall comply with the provision of the City of Redwood City's National <br /> Pollutant Discharge Elimination System(NPDES)requirements.A Stormwater Pollution <br /> Prevention Plan(SWPPP)outlining construction phase and post-construction phase <br /> measures to reduce pollutant discharge from the site shall be submitted for review and <br /> approval by the Engineering and Transportation Services prior to the issuance of <br /> Grading and Building Permits. <br /> Mitigation Measure HYD-2:If the project is constructed during the wet season(October <br /> through May), an erosion and sediment control plan, compliant with the City's NPDES <br /> (stormwater control)requirements, shall be prepared and implemented,to the <br /> satisfaction of Engineering and Transportation Services, prior to the onset of the wet <br /> season, and shall be maintained throughout the construction period. <br /> Mitigation Measure HYD-3:A Stormwater Control Plan (SWCP) shall be prepared to <br /> detail the permanent stormwater management facilities that shall be incorporated into <br /> the project to treat stormwater runoff and to control runoff rates and volumes after the <br /> construction process. The facilities shall, at a minimum, incorporate the following <br /> features and techniques:minimizing impervious surfaces, implementing the use of <br /> permeable pavers,leading drain rooftops downspouts to bio-retention basins, and using <br /> landscape swales, area drains, and a stormwater detention system on the project site. <br /> The SWCP shall be submitted for review and approval by the Planning Services and <br /> Engineering and Transportation Services prior to the issuance of Grading and Building <br /> Permits. <br /> Mitigation Measure HYD-4:The applicant shall submit a Hydrology and Hydraulics <br /> Study for review and approval by Planning Services and Engineering and <br /> Transportation Services prior to issuance of Grading and Building Permits to confirm: <br /> 1. The permanent stormwater management facilities incorporated into the project <br /> would reduce post-development stormwater discharge to equal or less than pre- <br /> development discharge levels; and <br /> 2. The City's existing storm drainage system in Kentfield Avenue would have adequate <br /> capacity to accommodate the project. <br /> Additional features shall be incorporated into the SWCP and the runoff estimates <br /> calculated, as needed to ensure compliance with the City's Municipal Code. <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> T <br />