My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.0 Environmental impact Checklist <br /> • All roadways, driveways, and sidewalks to be paved shall be completed as soon as <br /> feasible. Building pads shall be laid as soon as possible after grading unless seeding or <br /> soil binders are used. <br /> • Idling times shall be minimized either by shutting equipment off when not in use or <br /> reducing the maximum idling time to 5 minutes (as required by the California airborne <br /> toxics control measure Title 13, Section 2485 of California Code of ReguIations). <br /> • Clear signage shall be provided for construction workers at all access points. <br /> • All construction equipment shall be maintained and properly tuned in accordance with <br /> manufacturer's specifications.All equipment shall be checked by a certified visible <br /> emissions evaluator. <br /> • Post a publicly visible sign with the telephone number and person to contact at the lead <br /> agency regarding dust complaints.This person shall be responsible and take corrective <br /> action within 48 hours. The Air District's phone number shall also be visible to ensure <br /> compliance with applicable regulations. <br /> Mitigation Measure AIR-2:Demolition of the existing homes and buildings shall be <br /> performed consistent with District Regulation 11,Rule 2:Asbestos Demolition,Renovation <br /> and Manufacturing. <br /> Mitigation Measure AIR-3:Only one phase of construction shall occur at a time(e.g.,paving <br /> would occur prior to development of the homes). <br /> Operation <br /> The project meets the screening criteria for operational impacts because it is well below the <br /> screening threshold of 325 dwelling units.The project would be constructed using standard <br /> construction methods identified in the URBEMIS program. Given the small size of the project, <br /> the modest increases in traffic projected for the project, and that it is an infill project(versus a <br /> greenfield for which the screening criteria were modeled),the long-term occupancy of the <br /> homes would have a less than significant impact on air quality. <br /> c) Result in a cumulatively considerable net increase of any criteria pollutant for which the <br /> project region is in nonattainment under an applicable federal or state ambient air quality <br /> standard(including releasing emissions that exceed quantitative thresholds for ozone <br /> precursors)? <br /> Less-than-Significant Impact. According to the 2012. BAAQMD CEQA Guidelines, if a project <br /> requires a General Plan Amendment(GPA) or would generate more VMT than anticipated <br /> under a previous land use designation,there could be a significant cumulative impact. The <br /> proposed project would not require a GPA because implementation of the project would be <br /> consistent with allowable development identified for the project site's land use designation. The <br /> project site is designated for medium density residential development in the City's General <br /> Plan, and regional air quality modeling has therefore already factored in the vehicle trips <br /> associated with the proposed construction and development of the project site.The project <br /> would not result in a cumulatively considerable new increase in any criteria pollutant.Impacts <br /> would be less than significant. <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.