My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.0 Environmental Impact Checklist <br /> block on the plan set or by separate signed letter,either of which is approved by the <br /> City's Landscape Architect. <br /> Mitigation Measure BIO-3:Prior to Grading Permit issuance,the applicant shall be <br /> required to submit a Tree Protection Plan incorporating the specific measures included <br /> in the project's Tree Survey/Arborist Report to protect the coast live oaks and redwood <br /> tree on the project site. The Tree Protection Plan shall include fencing details, <br /> fertilization and pruning methods, and buffer work areas during construction.The plan <br /> shall be subject to review and approval by the City Landscape Architect.It shall consider <br /> the potential impacts and construction practices for all structures, including main <br /> buildings and accessory structures such as fences or walls. Loss of any of these trees <br /> within 2 years of construction shall be subject to Mitigation Measure BIO-2,which <br /> requires full replacement value. <br /> At minimum,post-construction, there would be the same amount of trees on-site as before <br /> construction of the project. With implementation of Mitigation Measures BIO-2 and BIO-3, <br /> impacts related to local policies and ordinances protecting biological resources would be <br /> less than significant. <br /> f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community <br /> Conservation Plan,or other approved local,regional, or state habitat conservation plan? <br /> No Impact. The project site and surrounding areas are not subject to a Habitat Conservation <br /> PIan(HCP) or a Natural Community Conservation Plan. The closest conservation plan to the <br /> project site is the San Bruno Mountain HCP, located approximately 12 miles north of the project <br /> area. Therefore, the project would not impact or conflict with these plans. <br /> 3.5 CULTURAL RESOURCES <br /> EessAnan- <br /> 5I r�lfl GnS Signalc <br /> 1 I ant LeST•thah- <br /> ulct Ih ,• Iowa with Signiticatll Na impact <br /> Impact wig alion <br /> . <br /> frncorpatarie <br /> •a) Cause a substantial adverse change in the <br /> significance of a historical resource as defined p ❑ ❑ I ❑ X <br /> in Section 15064.5? <br /> b) Cause a substantial adverse change in the ! i <br /> significance of an archaeological resource r ❑ r ❑ ❑ <br /> pursuant to Section 15064.5? <br /> c) Directly or indirectly destroy a unique ❑ i ❑ ❑ <br /> paleontological resource or site or unique <br /> geologic feature? <br /> d) Disturb any human remains,including those j <br /> interred outside of formal cemeteries? I ❑ I ® I ❑ ❑ <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.