Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br /> 1111.11211111M!' " <br /> i�N�t&a blltyn Me we fr pl!o� + nlef Ra sts wnl �$ !p <br /> a <br /> Putty <br /> Mitigation Measure AIR-1, continued <br /> • All roadways,driveways, and sidewalks to be paved shall be <br /> completed as soon as feasible. Building pads shall be laid as <br /> soon as possible after grading unless seeding or soil binders are <br /> used. <br /> • Idling times shall be minimized either by shutting equipment off <br /> when not in use or reducing the maximum idling time to 5 <br /> minutes (as required by the California airborne toxics control <br /> measure Title 13,Section 2485 of California Code of <br /> Regulations). <br /> • Clear signage shall be provided for construction workers at all <br /> access points. <br /> • All construction equipment shall be maintained and properly <br /> tuned in accordance with manufacturer's specifications. All <br /> equipment shall be checked by a certified visible emissions <br /> evaluator. <br /> • Post a publicly visible sign with the telephone number and <br /> person to contact at the lead agency regarding dust <br /> complaints.This person shall be responsible and take <br /> corrective action within 48 hours.The Air District's phone <br /> • <br /> number shall also be visible to ensure compliance with <br /> applicable regulations. <br /> Mitigation Measure AIR-2: Demolition of the existing homes and Applicant's City of Redwood ! During project demolition <br /> buildings shall be performed consistent with District Regulation 11, construction City Planning construction activities the <br /> Rule 2:Asbestos Demolition, Renovation and Manufacturing. contractor Services ; measure shall be implemented <br /> Mitigation Measure AIR-3:Only one phase of construction shall Applicant's City of Redwood During project construction <br /> occur at a time (e.g.,paving would occur prior to development of construction . City Planning ` activities the measure shall be <br /> the homes). — contractor Services implemented <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 74 <br />