My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program <br /> Mftfgalion M, ariiie Implertter�lr Res�er~si1<ale 5�rtea+�4e anti <br /> Party Moriftring Method <br /> Biological Resources <br /> Mitigation Measure BIO-1: A qualified biologist,hired by the City but Applicant City of Redwood During the nesting season,prior <br /> at the cost of the applicant,shall survey the project site to identify 1 City Planning to the removal of onsite <br /> the presence of nesting birds prior to removal of onsite vegetation Services vegetation/trees and general <br /> I and trees and general construction, if the tree removal or project project construction the <br /> construction is to occur during the nesting season.if an active nest measure shall be implemented <br /> is found,an avoidance buffer shall be established by the qualified If an active nest is found during <br /> biologist based on the type of bird,existing noise disturbance, and the pre construction survey, <br /> other relevant factors.Monitoring of the nest by the qualified monitoring shall occur <br /> biologist shall be required during project construction.Construction, throughout project construction <br /> including tree removal,within the avoidance buffer shall be until nestlings have fledged and <br /> prohibited until the qualified biologist has determined that the the nest is no longer active <br /> nestlings have fledged and the nest is no longer active.The <br /> biologist shall have the authority to halt or divert construction if <br /> necessary to ensure compliance with state or federal regulatory <br /> laws. <br /> Mitigation Measure BIO-2:The applicant shall be required to submit Applicant ' City of Redwood Prior to Grading Permit issuance, <br /> a final landscape plan to Planning Services for review and approval f City Planning ' the final landscape plan shall <br /> prior to issuance of the Grading Permit.The landscape plan shall Services and City's ' be submitted for the review and <br /> identify the protected trees for removal and the replacement trees F Landscape approval by Planning Services <br /> proposed,in accordance with the Tree Preservation Ordinance, Architect and City's Landscape Architect <br /> Chapter 35 of the Redwood City Municipal Code.The number, � <br /> species,size,and location of replacement trees shall be based on <br /> a value assessment prepared by a certified arborist and agreed <br /> upon by the City's Landscape Architect.Trees shall be replaced at <br /> a minimum of a 1:1 ratio,and shall be at least 24-inch box <br /> specimens.Approval of the landscape plan may be by means of a <br /> signed and stamped signature block on the plan set or by separate <br /> signed letter,either of which is approved by the City's Landscape <br /> LArchitect_ <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.