Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br /> Responsible 5chedole creed <br /> higligolion?demure. lmplenitntel Party iu4cu Rc,aing Mofwflvtl al. <br /> Mitigation Measure HYD-2: If the project is constructed during the Applicant and City of Redwood In the event project <br /> wet season (October through May),an erosion and sediment construction City Engineering construction occurs during the <br /> control plan,compliant with the City's NPDES (stormwater control) contractor and Transportation wet season,an erosion and <br /> requirements,shall be prepared and implemented,to the Services sediment control plan shall be <br /> satisfaction of Engineering and Transportation Services,prior to the submitted for the review and <br /> onset of the wet season,and shall be maintained throughout the approval by Engineering and <br /> construction period. i Transportation Services <br /> The erosion and sediment <br /> control plan shall be <br /> implemented during project <br /> __ construction in the wet season <br /> Mitigation Measure HYD-3:A Stormwater Control Plan (SWCP) shall Applicant u City of Redwood Prior to Grading and Building <br /> be prepared to detail the permanent stormwater management I City Planning ' Permit issuance,the SWCP shall <br /> facilities that shall be incorporated into the project to treat i Services and be submitted for the review and <br /> stormwater runoff and to control runoff rates and volumes after the Engineering and approval by Planning Services <br /> construction process.The facilities shall,at a minimum, incorporate Transportation and Engineering and <br /> the following features and techniques:minimizing impervious Services Transportation Services <br /> surfaces,implementing the use of permeable pavers,leading drain <br /> rooftops downspouts to bio-retention basins,and using landscape <br /> swales,area drains,and a stormwater detention system on the <br /> project site.The SWCP shall be submitted for review and approval <br /> by Planning Services and Engineering and Transportation Services <br /> prior to the issuance of Grading and Building Permits. <br /> Mitigation Measure HYD-4:The applicant shall submit a Hydrology Applicant City of Redwood Prior to Grading and Building <br /> and Hydraulics Study for review and approval by Planning Services ' City Planning Permit issuance,the Hydrology <br /> and Engineering and Transportation Services prior to issuance of I Services and and Hydraulics Study shall be <br /> Grading and Building Permits to confirm: Engineering and submitted for the review and <br /> 1. The permanent stormwater management facilities i Transportation approval by Planning Services <br /> incorporated into the project would reduce post- Services and Engineering and <br /> development stormwatei discharge to equal or less than pre- Transportation Services <br /> development discharge levels: and <br /> 2. The City's existing storm drainage system in Kentfield Avenue <br /> would have adequate capacity to accommodate the <br /> project. <br /> Additional features shall be incorporated into the SWCP as needed <br /> to ensure compliance with the City's Municipal Code. <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 79 <br />