Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br /> llacolop oetj <br /> iii <br /> tuee Implementer <br /> Responsible <br /> Po+iy Manktoring MethQ:: .. <br /> Hazards and Hazardous Materials <br /> Mitigation Measure HAZ-1: Prior to demolition, a complete asbestos TApplicant City of Redwood 1 Prior to project demolition,an <br /> survey shall be conducted in accordance with National Emissions City Planning I asbestos survey shall be <br /> Standards for Hazardous Air Pollutants (NESHAP) guidelines. All Services I conducted <br /> suspect asbestos-containing materials (ACMs) shall be sampled to If ACMs are found during the I <br /> determine the presence or absence of asbestos prior to building survey,a licensed asbestos <br /> demolition activities. If ACMs are found, a licensed asbestos abatement contractor shall be <br /> abatement contractor shall be retained to abate the identified <br /> ACMs. I retained to abate the identified <br /> - - - - — — - - — -J - - --, ACMs - -- <br /> Mitigation Measure HAZ-2: Prior to demolition, a comprehensive Applicant City of Redwood Prior to project demolition,a <br /> lead based paint (LBP) survey shall be conducted. If any LBP is City Planning comprehensive LBP survey shall <br /> identified,if shall be removed from the site in accordance with all Services be conducted <br /> applicable regulations, including California Division of <br /> Occupational Safety and Health (Cal/OSHA) Lead in Construction If LBP is found during the survey, <br /> it shall be removed prior to <br /> Standard,as included in California Code of Regulations,Title 8, project demolition in <br /> Section 1532.1,during demolition activities.These requirements accordance with applicable <br /> include employee training, employee air monitoring,and dust regulations <br /> control. If lead paint is peeling,flaking or blistered,it shall be <br /> removed prior to demolition. It is assumed that such paint will <br /> become separated from the building components during <br /> demolition activities and could become air-borne;therefore it shall <br /> be managed and disposed as a separate waste stream.Any debris <br /> or soil containing lead paint or coat shall be disposed at landfills <br /> that are permitted to accept the waste being disposed. <br /> Hydrology and Water Quality <br /> — <br /> Mitigation Measure HYD-1:All project grading,construction, and Applicant and City of Redwood Prior to Grading and Building <br /> subsequent operations shall comply with the provision of the City of construction City Engineering Permit issuance,the SWPPP shall <br /> Redwood City's NPDES requirements. A SWPPP outlining contractor and Transportation be submitted for the review and <br /> construction phase and post-construction phase measures to Services approval by Engineering and <br /> reduce pollutant discharge from the site shall be submitted for Transportation Services <br /> review and approval by the Engineering and Transportation <br /> Services prior to the issuance of Grading and Building Permits. The SWPPP <br /> be <br /> implemented <br /> during project <br /> construction and post- <br /> construction <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 78 <br />