My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program <br /> MItkgition PitrAlu re triipli iee.elicr Rirca iliL rlI M tho <br /> Mitigation Measure HAZ-2:Prior to demolition,a comprehensive lead based Applicant City of Redwood City Prior to project demolition,a <br /> paint(LBP)survey shall be conducted.If any LBP is identified,it shall be Planning Services comprehensive LBP survey shall be <br /> removed from the site in accordance with all applicable regulations, conducted <br /> including California Division of Occupational Safety and Health(Cal/OSHA) If LBP is found during the survey,it <br /> Lead in Construction Standard,as included in California Code of Regulations, shall be removed prior to project <br /> Title 8,Section 1532.1,during demolition activities.These requirements demolition in accordance with <br /> include employee training,employee air monitoring,and dust control.If lead <br /> paint is peeling,flaking or blistered,it shall be removed prior to demolition. applicable regulations <br /> It is assumed that such paint will become separated from the building <br /> components during demolition activities and could become air-borne; <br /> therefore it shall be managed and disposed as a separate waste stream.Any <br /> debris or soil containing lead paint or coat shall be disposed at landfills that <br /> are permitted to accept the waste being disposed. <br /> Hydrology and Water Quality <br /> 4 <br /> Mitigation Measure HYD-1:All project grading,construction,and subsequent Applicant and City of Redwood City Prior to Grading and Building Permit <br /> operations shall comply with the provision of the City of Redwood City's construction Engineering and issuance,the SWPPP shall be <br /> NPDES requirements.A SWPPP outlining construction phase and post- contractor Transportation submitted for the review and <br /> construction phase measures to reduce pollutant discharge from the site Services approval by Engineering and <br /> shall be submitted for review and approval by the Engineering and Transportation Services <br /> Transportation Services prior to the issuance of Grading and Building The SWPPP shall be implemented <br /> during project construction and <br /> post-construction <br /> Mitigation Measure HYD-2:If the project is constructed during the wet Applicant and City of Redwood City In the event project construction <br /> season(October through May),an erosion and sediment control plan, construction Engineering and occurs during the wet season,an <br /> compliant with the City's NPDES(stormwater control)requirements,shall contractor Transportation erosion and sediment control plan <br /> be prepared and implemented,to the satisfaction of Engineering and Services shall be submitted for the review <br /> Transportation Services,prior to the onset of the wet season,and shall be and approval by Engineering and <br /> maintained throughout the construction period. Transportation Services <br /> The erosion and sediment control <br /> plan shall be implemented during <br /> project construction in the wet <br /> season <br />
The URL can be used to link to this page
Your browser does not support the video tag.