Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br /> 1CCS�9kYTi�FilSla• i:lu'tluilr .tat'JJ <br /> 1'►+i9Glg non Wiwi re 4161111.114 fit ?rhrivE° �M1�iiotulzil Ijiw r+irVltali. <br /> Mitigation Measure HYD-3:A Stormwater Control Plan(SWCP)shall be Applicant City of Redwood City Prior to Grading and Building Permit <br /> prepared to detail the permanent stormwater management facilities that Planning Services and issuance,the SWCP shall be <br /> shall be incorporated into the project to treat stormwater runoff and to Engineering and submitted for the review and <br /> control runoff rates and volumes after the construction process.The Transportation approval by Planning Services and <br /> facilities shall,at a minimum,incorporate the following features and Services Engineering and Transportation <br /> techniques:minimizing impervious surfaces,implementing the use of Services <br /> permeable pavers,leading drain rooftops downspouts to bio-retention <br /> basins,and using landscape swales,area drains,and a stormwater detention <br /> system on the project site.The SWCP shall be submitted for review and <br /> approval by Planning Services and Engineering and Transportation Services <br /> prior to the issuance of Grading and Building Permits. <br /> Mitigation Measure HYD-4:The applicant shall submit a Hydrology and Applicant City of Redwood City Prior to Grading and Building Permit <br /> Hydraulics Study for review and approval by Planning Services and Planning Services and issuance,the Hydrology and <br /> Engineering and Transportation Services prior to issuance of Grading and Engineering and Hydraulics Study shall be submitted <br /> Building Permits to confirm: Transportation for the review and approval by <br /> 1. The permanent stormwater management facilities incorporated into Services Planning Services and Engineering <br /> the project would reduce post-development stormwater discharge to and Transportation Services <br /> equal or less than pre-development discharge levels;and <br /> 2. The City's existing storm drainage system in Kentfield Avenue would <br /> have adequate capacity to accommodate the project. I <br /> Additional features shall be incorporated into the SWCP as needed to ensure <br /> compliance with the City's Municipal Code__ — <br /> I i Noise <br /> — <br /> Mitigation Measure NO1-1:The applicant shall be required to submit to Applicant City of Redwood City , Prior to Building Permit issuance,a <br /> Planning Services for review and approval prior to issuance of Building Planning Services I detailed analysis of noise reduction <br /> Permits,a detailed analysis of noise reduction measures to be incorporated I measures to be incorporated into <br /> into the project The analysis shall identify noise-reducing building the project shall be submitted for the <br /> materials,such as windows and doors with high Sound Transmission Class I review and approval by Planning <br /> (STC)ratings or forced-air mechanical ventilation systems. —I L — Services <br /> —L <br />